piping designe engineer for oil and gas field
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
Total exp: 29 Years
Professional Experience
HAVE DONE:
PROJECT STUDY AND EXECUATION OF WORK.
HAZOP STUDY OF PROJECT WORK.
HAZARDOUS AREA CLASSIFICATION.
PREPARE DOCUMENT FOR TENDERING AND QUATATION.
PLANNING AND KEEPING TRACK OF DESIGN WORK / CONSTRUCTION WORK.
WORK LOG SHEET AND HISTOGRAM CHART.
ESTIMATION AND QUOTATION OF WORK.
DESIGN WORK OF MECHANICAL / PIPING / STRUCTURAL AND CIVIL WORK.
PROCEDURE OF HANDOVER OF WORK COMPLETION.
PROCEDURE OF AS-BUILT DRAWINGS HANDOVER.
MATERIAL’S TAKE OFF FOR PROJECT WORK.
PROCEDURE OF QUANTITY SURVEY.
PDO SPONSORED COURSES ATTENDED
Safety Induction - 18.02.89
H2S Basic - 09.02.89
H2S Refresh - 23.06.93
Fire exting. - 10.02.89
Permit to work - 08.01.90
Driving Attitude - 03.12.89
Driver Skill - 14.05.90
Safety @ Work - 05.04.87
P.S.A.P - 13.07.89
Industrial Harnesses - 12.12.94
Basic First Aid - 01.09.91
Team Building - 01.04.97
Stop - 01.11.99
Eductation
Educational Qualification:
1) Computer Aided Design (C.A.D)
(From Data Pro. Bombay during Year 1988)
a) Familiar with ACAD R2000 / EXCEL / WORD /POWER POINT
2) Diploma in Mechanical Draughts man
From Kareer Polytechnic Bombay
(Passed During Year 1977)
b) Familiar with API.SPEC. / ASME / SHELL STD. / DEP. / ERD. /EDMS
3) S.S.C (Father Agnel Technical High School Bombay
Certification
will submit on request
Additional Information
EXPERIENCE DETAILS:
Seconded to "Petroleum development Oman" as a "MECHANICAL ENGINEER / PIPING DESIGNER” (AREA MARMUL FIELD)
Project carried out as follows
a) Water supply well details design.
b) Water disposal well details design.
c) Multiport selector valve skid detail design. / Installation design.
d) Coriolis hook-ups detail design.
e) Chemical injection skid detail design. (On pad / station)
f) Oil flow line / & gas well pad hook-up to manifold.
g) Detail design of installation of oil / gas manifold (on pad / station)
h) Site visit / Detail Drawings (Mech. / Civil / Structural / Pefs /Piping Plan/ Isometric / XTD topographical maps /Material List/
Requisition List.) For FCP. / IWR.
i) Planning & scheduling cost estimating & control tracking of performance & distribution of work packages, and training of Omani designers.
j) Coordination / Leader of Drawing office @ Marmul
Hot Categories
Chemicals
Batteries