J.V.V. SATYANARAYANA
RAJAHMUNDRY-ANDHRA-INDIA
POSITION APPLIED FOR : Startup Engineer
AVAILABILITY : SHORT NOTICE
CURRENT LOCATION : QATAR(ON VISIT VISA)
POINT OF ORIGIN : VISAKHAPATNAM-INDIA
PERSONNEL PROFILE:
Name : j.v.v.satyanarayana
Date of birth & Age : 10.01.1965 & 41 Years
Nationality : Indian
Marital status : Married
Passport Validity : VALIDITY: 23.05.2015
EDUCATIONAL QUALIFICATION:
1.Associated Degree in Chemical Technology from Osmania University, INDIA.
2.DIPLOMA IN INDUSTRIAL SAFETY
CAREER OBJECTIVE:
To work and share knowledge and experience with fellow oil&gas industry colleagues and team players,honest and reliable with good references and wealth of oil&gas industry knowledge that would be an asset for any potential employer.
PROFESSIONAL SUMMARY
Good working knowledge of GAS PROCESSING OPERATION , REFINERY, GAS TO LIQUID-SYNTHESIS GAS UNITS AND TAIL GAS RECOVERY H2S REMOVAL,SOUR WATER STRIPPING AND SULPHUR RECOVERY as
As a Commissionning Shift Leader (COMMISSIONNING&START UP) Responsibilities include the Pre-commissioning, Commissioning ,Startup, Shutdown and Trouble Shooting, operations of process plant .
1.ORYX-GAS TO LIQUID PROJECT(SASOL&QP)
2.GAS PLANT &ULG/LSGO REFINERY PROJECTS(TAKREER REFINERY)
· SOUR WATER TREATMENT
· SULPHUR RECOVERY_
· H2S REMOVAL UNIT
· FLARES&CONDENSATE RECOVERY UNITS
· HNHT/LNHT&GAS OIL HYDRO TREATING
3. HYUNDAI ENGINEERING & CONSTRUCTION CO.LTD&ENI AGIP. South Pars Gas Field
Development A ONE project Phases 4 & 5 Working as a Commissioning Supervisor in Phase 4&5, At Assaluyeh for National Iranian Oil Company, IRAN.
South Pars Gas Field Phases 4 & 5 of 2000 MMSCFD GAS PROCESSING PLANT
·
4. HYUNDAI ENGINEERING &CONSTRUCTION CO.LTD, SOUTH PARS PHASES 2&3
AS A SINIOR CONTROL ROOM OPERATOR
·
Eductation
associated degree in chemical technology
osmania university
Certification
H2S TRAINING
PERMIT SYSTEM
Additional Information
1 COMMISSIONING OF 2000 MMSCFD GAS FIELD DEVELOPMENT WITH M/S HYUNDAI CONSORTIUM.(ENI AGIP DEVELOPPED NATIONAL IRANIAN OIL PROJECT
2 COMMISSIONNING /START UP OF PROPANE,BUTANE STORAGE/EXPORT/REFRIGERATION
3 FUEL GAS(H.P/L.P),EXPORT GAS/CONDENSATE STABILISATION,RECEPTION,FLARES AND BLOWDOWNS,
4 SULPHUR RECOVERY-CLAUS PROCESS(LURGI)-4 TRAINS
5 COMMISSIONING OF PIPE REACTOR TECHNOLOGY- INCRO- SPAIN
6 COMMISSIONING OF AMMONIA STORAGE AND REFRIGERATION FACILITIES WITH M/S TOYO ENGINEERING.
7 MAJOR ACTIVITIES DURING COMMISSIONNING PREPATION PUNCH LIST/EXCEPTION LIST AT RFSU.
8 SODA WASH OF SULFINOL SYSTEM
9 RUN IN OF ROTATING EQUIPMENT
10 FUNCTIONAL TESTING
11 FINAL LEAK TESTING AND INERTING
12 DCS&EMERGENCY SHUTDOWN
13 DRYING OF CRYOGENIC LINES USING DRY AIR OR NITROGEN
14 PUNCH LIST AT RFSU
15 COMPLETION OF HANDOVER DOSSIER AT RFSU
16 COMMISSIONNING&OPERATION OF UTILITIES SYSTEM
17 SUPERVISION OF VENDOR &LICENSOR
18 CO-ORDINATION WITH SAFETY ENGINEER WITNES/PERFORM TEST RUN
16 CONFIRMATION OF REINSTATEMENT OF PIPING SYSTEM
17.CHECKING INSULATION AND TRACING
18.ALARM&TRIP CHECK
19.FURNACE DRY-OUT
20.RUN IN OF COMPRESSOR.