PROCESS PLANT OPERATOR
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 6 years
Relocation: No
Career Objective
To establish a career in a reputable organization that will make good use of my abilities
Professional Experience
5 years experience with Attock Refinery Ltd including Erection, Precommissioning and Commissioning of. HYDRO TREATING & FIX BED PLATE FORMING UNIT
Presently working in Attock Refinery Limited at NHT/ SR Plant as a DCS Panel Operator.
Also worked as Field Operator In charge at plate-forming unit plant.Up gradation Project experience:
The Up gradation and Expansion Project of ARL which enhanced its Production capabilities to 37,500 BPSD.The ARL, s with its operation dating back to 1922,is the first Crude Oil Refinery of Pakistan. I was involved in its Erection, Pre-Commissioning and Commissioning activities,
Punch Listing. Line Flushing / Blowing. Dry Out Procedure of Heaters
Pressure Testing. Overall Tightness Test (OATT)
Monitoring The Operation & Trouble Shooting of Following Equipments:
Pumps & Compressors.
Heaters.
Distillation towers.
Utilities and cooling tower.
Heat exchangers.
Eductation
Technical Qualifications
(AUG 1995 – SEP 1998) Three year diploma of associate engineer in chemical technology (2145/3200) from G.C.T MULTAN (1st division)
Matriculation
JUNE 1994 – MAR 1995) Matriculation in science from Multan board of education (1st division)
Certification
·Safety & Fire Fighting Training - Attock Refinery Ltd Rawalpindi.
·Work Permit Policy Training - Attock Refinery Ltd Rawalpindi.
·Skimming of Catalyst Training - Attock Refinery Ltd Rawalpindi.
·Safe Start Up & Shut Down Training - Attock Refinery Ltd Rawalpindi
Additional Information
Job Responsibilities:
·Controlling and monitoring unit parameters by DCS and Panel in technically safe manner.
·Reporting unit/section status or operation status to Shift Engineer with shift logs/shift report.
·Communicating with Field Operators.
·Shut down & Safe Start up Procedure (Normal as well as Emergency) of NHT/Plate-forming Plant.
· Troubleshooting in safe action of NHT/Plate-forming Plant in case of any emergency.
· Coordinate with oil movement dept, for the proper throughput of products according to specifications
· Follow Standard Safety Procedures, Work order and Work permit.
· Preparation of Unit Daily Summary & Material Balance
Hot Categories
Chemicals
Batteries