My Resume
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
Project Manager
Professional Experience
March 2005 to Till Date
Project Engineer Facility Management
Water Pumping & Power Supply Schemes
Responsibilities: SCADA - Facility Management
June 2001 to March 2005
Tamil Nadu Electricity Board, Madras 600 002
Responsibilities: Assistant Executive Engineer
Projects Division -Head Quarters Computer Center
November 1998 June 2001
Tamil Nadu Electricity Board
Operation -210 MW Coal fired Boiler & Steam Turbine
North Chennai Thermal Power Station
March 1997 November 1998
Operation of 4 X 30 MW Frame 6 Gas Turbines
October 1992 March 1997
Tamil Nadu Electricity Board, Madras 600 012
Responsibilities: Assistant Engineer Gas Turbines Projects Division Madras 600 002
January 1988 October 1992
Tamil Nadu Electricity Board, Trichy 625 001
Responsibilities: Assistant Engineer Meter Relay Tests
November 1985 December 1987
A.C. College of Engineering Technology, Karaikudi
Responsibilities: Associate Lecturer Dept. of EEE&
Oct 1984 November 1985
Anna University, Madras 600 025
Responsibilities: Teaching Research Fellow
Department of Electrical & Electronics Engineering
Eductation
Fuel Unloading and fuel forwarding pump houses. Flame proof lighting installations procedures. Light up, Box up procedures & Operation of 210 MW Coal Fired Boiler & KWU Steam Turbines. 30 MW Frame 6 Gas Turbines. Pipe Line Transfer of Naphtha. Fuel Unloading & Forwarding Systems - Naphtha & LFO. Cathodic Protection of Pipe Lines, DC Systems, Battery Set Initial Charging and Maintenance.
Co-Ordination with Supplier, Clients, Production and Maintenance at Project Sites and at Thermal Stations.
Installation & Commissioning of LAN Integration of LAN in to WAN
Project Formulation, Planning, Scheduling, Tracking, Controlling, Coordination, Execution
Projects Handled : Power Sector (Core Area)
110/33-11 KV Substations - 3 No.s, 33/11 KV Sub- Stations - 4 No.s
11/110 KV Switch Yard for 4 x 30 MW GT 1 No.
30 MW Frame 6 Gas Turbines-Mark IV 4 No.s
Fire Protection System - Gas Turbine 1 No.
Certification
Computer Skills Working Knowledge in PRIMAVERA
MS Office (Word, Excel, Power Point & Access)
Computer Networking,
Installation of Operating Systems & Databases
Installation of Application Software
Training Programs
Subject Period Institution
Extra High Voltage Technology 13 days Jabalpur Engg. College, Jabalpur
Micro-Processors Applications for Power System Protection & Control 15 DaysRegional Engineering College, Calicut,
Fire Prevention & Fire Fighting 5 Days Staff Training College, TNEB
Computer Networking 5 Days Indian Institute of Technology, Chennai
Software Project Management 5 Days Anna university, Chennai
Operation & Maintenance of Gas Turbines 13 Bharat Heavy Electricals, Hyderabad
Additional Information
Testing & Commissioning of Power System Engg. Equipments.Earthing Energy Metering, Meter & Relay Testing. Installation & Commissioning of Gas Insulated Sub Stations Up to 110 KV. Time Gradation of Relays & Relay Coordination. Determination of fault levels on Power System, Specifications for Power System Apparatus, Sizing of Cables, Cable Schedules, Cable Routing, Control Panel Layouts, Cable Termination Schedules Neutral Grounding Methods & Design of Earth Mats. Preparation of Drawings to inter connect LT power, Control & Relay, RTCC and Instrumentation Panels Carrying out routine and type tests on all power system distribution equipments (type tested a 50MVA 11/110 KV Generator Transformer for Impulse Volts. @ IIT Chennai). Paralleling of Generators & Transformers Diesel Engines Troubleshooting in Synchronizing & Control Circuits Drawing out Maintenance schedule for electrical equipments in Gas Turbine Station, Sub Stations and Switch yards, HT and LT Distribution Network. PLC,SCADA, Telemetry & DCS Systems & Networks,Gas Turbines, Steam Boilers and Turbines & Wind Electric Generators.
Hot Categories
Chemicals
Batteries