Mechanical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
Find a challenge job.
Professional Experience
Since 2005 SNC-LAVALIN INC., Calgary, Alberta, Canada
Mechanical Specialist, Chemical & Petroleum Business Unit
w Saudi Arabian Oil Company (Saudi Aramco) Southern Area Sea Water Expansion Project, Saudi Arabia (May – Present). Duties and responsibilities included:preparing and Reviewing the mechanical specifications, technical data, inspection plans and drawings for sea water filtration package(ASME U stamp), RTRP sparger and SO2 Scrubber (ASME RTP stamp), and fuel gas’ K.O drum, filter,and superheater for GE gas turbines in accordance with ARAMCO’s specifications, ASME, API and ASTM codes, etc.
· Performing Bid calarification and evaluation, and attending the meeting with vendors.
· Site visited ARAMCO seawater treatment plant and pump stations in Saudi Arabia, and wrote report.
2003-2005 REALEX PROPERTY MANAGEMENT INC., Calgary, Canada
Power
1999-2001 GENERAL ELECTRIC (CHINA) INC., Shanghai, China
Project Manager, Sourcing Department, Power Systems
w Fabrication, Machining and Erection of Dezhou 2x600MW Steam Turbine LP Hoods and Inner Casings, Harbin Turbine Company. Duties and responsibilities included:
· Managing the project per GEPS’s specification and drawings
· Reviewing the WPS, PQR, Process Plan, ITP, and NDE/PWHT Records
· Resolving the quality deviation, and prgress delay issues.
1997-1999 SIEMENS WESTINGHOUSE (CHINA) INC., Beijing, China
Mechanical Engineer, China Sourcing Center, Power Business Unit
w Dalian/Dandong 4x350MW Power Plants under the Consortium of Mitsui Babcock, Westinghouse and Sargent Landy, Client: Huaneng Power International (HPI). Duties and responsibilities included:
· Inspecting the quality control points in local suppliers’ manufacturing plants.
w Yanzhou 2x600MW Power Plants, Client: HPI. Duties and responsibilities included resolving technical issues with Huaneng Power International.
w Yuzhou 2X350 MW EPC Contract Finalization. Duties and responsibilities included participating in the technical negotiation meeting of boiler group.
1989-1997 HARBIN POWER ENGINEERING COMPANY, Harbin, China
Proposal Manager Mechanical Engineer
w Boiler, capacity ranged 1028t/h, 670t/h, 200t/h, and 20t/h. Duties and responsibilities included:
·Jamshoro 2x200MW Oil-Fired Power Plants, Pakistan. Duties and responsibilities included technical service for the outstanding commissioning issues.
Eductation
EDUCATION
1989 Master’s Degree of Thermal Power Engineering, Harbin Institute of Technology, Harbin, China
1986 Bachelor’s Degree of Thermal Power Engineering, Xi’An Jiaotong University, Xi’An, China
Certification
PROFESSIONAL ASSOCIATIONS
Association of Professional Engineers, Geologists and Geophysicists of Alberta (APEGGA), 2004.6 – Present, Registration No. 74607
ABSA Power Engineer Class 4th, 2003.8 – Present, Registration No. A-57380
Additional Information
Mr. Sam Sun has a total of 16 years in the thermal/electric power industry, with 10 years of experience in EPC or package environment, 4 years of fabrication inspection, requisition, and project management; and 2 years of operation and maintenance. He is fluent in English and Chinese and has extensive international experience in Pakistan, Japan, Singapore, Malaysia, Thailand, and Hong Kong.