Manoj
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
To be the ?§Best in Business?¨.
Professional Experience
June 03 ?V Till Date
Designation : Planning Engineer
Company : ETA ?V Ascon Group of Companies
M&E Division
P.O. Box ?V 5239
Dubai, UAE.
Projects Handled : Old Town Commercial Island ?V The Burj Development
Capital Towers
Dubai International Financial District ?V The Gate
Dubai Marina ?V Fitness Centre
Dubai Marina ?V Point Restaurant
Dubai Central Prison
August 02 ?V May 03
Designation : Assistant Engineer - Planning
Company : Gammon India Limited
Mumbai
India
Projects Handled : Teesta Hydro-Electric Project
JOB PROFILE
A. Construction Schedule
„X Preparation of Planning Schedule in Primavera Project Planner for Civil/MEP Works.
„X Updating the Schedule
„X Progress Reporting
„X Resource Planning.
„X Cost/ Budget Planning.
Schedule of Works
Prepare schedule of works demonstrating fulfilment of all contract requirements, which include specific requirements regarding restraints & milestones and interrelation with all co-contractors. Prepare the Work Breakdown Structure (WBS) accordance with the project requirements. The schedule of works is prepared as logic linked time-scaled bar chart format with the Work Breakdown Structure, to show the sequence and interdependence of activities required for the complete performance of all items of work under the contract scope. The Schedule is prepared using the Critical Path Method technique using Primavera Project Planner (P3) software. Submit to Consultant the CPM network diagram, analysis of predecessor/successor relationships to explain and support the schedule bar chart. In preparing the schedule due care is exercised with respect to identifying all activities to cover the entire contract scope, identifying the durations of each of them and relationships between them, proper management of float and coordination of all subcontractors schedules.
Cost Loaded Schedule
Anticipated financial values of works are assigned to all the activities of the schedule of works in line with the contract BOQ.
Manpower Loaded Schedule
Estimate the number of man-days required for each of the construction schedule activities and assign the same to the schedule.
S Curves and Histograms
Cost curves and histograms for different manpower trades are prepared. A cash flow curve is prepared.
Eductation
2001 - 2002
Degree : Post Graduate Diploma (P.G.Dip) ?V Advanced Construction Management (ACM)
Institute : National Institute of Construction Management & Research (NICMAR), Pune.
Result : GPA 6.65
1995 ?V 1999
Degree : Bachelor of Engineering (B.E) ?V Civil
University : Bangalore University
Result : First Class With Distinction.
1993 ?V 1995
Degree : Higher Secondary (HSC)
University : Pre University Board, Karnataka
Result : First Class.
1992 - 1993
Degree : State Secondary (SSC)
University : State Secondary Board, Karnataka
Result : First Class With Distinction.
Additional Information
KNOWLEDGE
„X Construction Project Management
„X Quality Management
„X FIDIC Contract
„X ISO
SKILLS
„X Primavera Project Planner (P3)
„X Microsoft Project (MSP)
RESEARCH UNDERTAKEN
Post Graduate Course
Thesis Topic : Application of Operational Research Techniques for Quality Assurance in
Construction.
Objective : To analyse the feasibility of various quantitative techniques for Assuring quality
in Construction.
Graduate Course
Topic : Comparison of Manual method of Structural Analysis with STAAD Software.
Objective : To study the functioning logic of a Software Package.
COMPUTER PROFICIENCY
Operating Systems : Windows 95/ 98/ 2000/ NT/ XP
Project Planning Software : MS Project, Primavera
Design Software : Staad-III, SAP 90.
Software Packages : Microsoft Office
EXTRA CURRICULAR ACTIVITIES
„X Reviewed the existing Project Management System of ETA ?V M&E Division with suggestions for improvement.
„X Represented College in various Cultural Activities & have won recognition.
„X Participated in Social Awareness Activities.
„X Attended First ?V Aid Training Programme conducted by St. John?¦s Ambulance.
„X Participated in Managerial Skills Workshop.
Hot Categories
Chemicals
Batteries