C.V FOR INSTRUMENT SUPERVISOR/TECHNICIAN
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
To obtain a reputable and responsible Position in Professional career.
Professional Experience
PROFESSIONAL EXPERIENCE
Pak Arab Refinery Limited Instrument Technologist Jan. 2000 to onward
Pakistan Atomic Energy Commission, Chashma Nuclear Power Project. Distt. Mianwali Instrument Technician (Worked During Construction, & Commissioning) Jul, 1997 to Nov, 1998
Pakistan Atomic Energy Commission, Karachi Nuclear Power Plant Karachi. Instrument Technician Jun. 1996 to Jul. 1997.
Eductation
TECHNICAL QUALIFICATION
Post Diploma Course & on job Training in Power Plant Technology. KINPOE (Kunpp Institute Of Nuclear Power
Engineering Karachi. 1997/ One year
DAE in INSTRUMENT Technology. Pak Swiss Training Center Karachi. 1995/Three Years
Certification
PROFESSIONAL TRAININGS & COMPUTER SKILLS
Site System & Maintenance of TLAS (Truck loading Automation system) of Parco. One Week
Conduct by FISHER ROSEMOUNT Singapore. 2001
Operation of TLAS (Truck loading Automation system) of Parco. One Week
Conduct by FISHER ROSEMOUNT Singapore 2001
Tank Gauging System One Week
Conduct By Sakura Endress 2001
Meter Proving by Brooks Compact Provers One Week
Conduct by FISHER ROSEMOUNT Singapore
2001
Refinery Process (Training held in NATIONAL REFINERY KARACHI.) Under Supervision of PETROMAN Karachi.
Two Years 2000
MS Office (DOS+Windows 95+98+2000+XP+Excel +Power point) & INTERNET
Two Month
2000
Additional Information
JOB RESPONSIBILITIES.
Presently I am working in Pak Arab Refinery Limited (Qasaba Gujrat Distt.Muzaffargarh Pakistan & Abu Dhabi Joint Venture, Parco is largest refinery of Pakistan.) as an Instrument & Control Technologist
PRESENT RESPONSIBILITIES ARE
Tank Gauging System
Calibrated & commissioned the Servo type tank-gauging system and dealt with the day-to-day problems. (Proservo NMS53…Series SAKURA ENDRESS)
Vibration Monitoring System
Calibration & configurations had done on BENTLY NEVADA vibration monitoring system on heavy-duty pumps, compressors. (3300)
Transducer & Transmitter
Maintenance, Installation and calibration of pressure, level, flow and temperature transmitters.
(Foxboro, Rosemount)
Switches
Maintenance, Installation and calibration of Vibration pressure, level, flow and temperature switches.
Control Valves & Positioners Calibration
Maintenance and calibration of the following companies control valves:
Fisher 3582, 3570, 3600 series, Masonelan, Nova Pignone, ABB, Trip Relay of Fisher.
Brooks 700 And 788 Digital Control valves and Two Stage Control Valves.
FLOWMETERS
Calibration and troubleshooting of following flow meters.
1. Ultrasonic flow meters (Peek)
2. Turbine & P.D.Flow meters (Brooks)
Meter Proving
With Brooks Compact Prover proved the turbine & P.D. flow meters of blending & truck loading areas.
Load Cells
Calibration & maintenance performed of the DIGITAL LOAD CELLS & weighbridge. (AVERY, T 301)
Hot Categories
Chemicals
Batteries