resume sks
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 16 years
Relocation: Yes - Internationally
Career Objective
Planning, designing, implementation of projects related to oil and gas production, storage and transportation
Professional Experience
1.Operation and maintenance of natural gas compressor packages, gas dehydration plants and other accessories.
2.Indenting, technical scrutiny and procurement activities.
3.Planning and budgeting activities
4.Project planning using MS Project tool and feasibility study
5.Contract preparation, bid evaluation and contract / construction management
6.Planning, designing and laying of cross country pipelines.
7.Planning, designing and erection of petroleum handling facilities.
Eductation
2001 M.B.A Finance (Through distance learning,IGNOU, New Delhi)
1988 Bachelor of Engineering – Mechanical Engineering(First Class)
1983 12th standard (First division)
1981 10th standard (First division)
Certification
2005 Certified Petroleum Manager (Indian School of Petroleum, New Delhi)
Additional Information
Key accomplishments :
1.Break down, periodic, preventive maintenance as well as overhauling of natural gas compressor packages up to 5MMSCFD capacity and 3500 PSIG deliver pressure resulting in reduced downtime and increased availability.
2.Procurement of various materials, oil field equipment and accessories. 3.Planning and compilation of departmental annual budgets for five years.
4.Performed project feasibility study for a number of high value projects like Cross country pipelines, Gas compressor stations, Gas well production installations and other production facilities.
5.Planning, designing and laying of one natural gas transportation pipe line, 16” NB diameter, 22 KM long, resulting in increased gas production by evacuation of additional 1.4 MMSCMD gas from satellite production fields.
6.Revamping of one Formation water clarification plant of 900 KL per day capacity and creation of necessary infrastructure for treatment and disposal of clarified formation water, resulting in minimization of environmental pollution.
7.Planning, designing and erection of one natural gas production installation of 2.0 MMSCFD capacity, resulting in higher gas availability.
8.Planning, designing and erection and commissioning of one oil production installation, 1200 KL per day capacity inclusive of material procurement.
9.Planning, designing and erection and commissioning of seven nos. oil storage tanks, 2200 KL capacity in total inclusive of material procurement.
Hot Categories
Chemicals
Batteries