Lead Pipelines Engineering & Planning Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
pipelines facilities planning and designing, preparation of design basis scoping paper for detail design and project execution. The objective is to provide advice, consultation, and recommendations to formulate the corporate investment plans.
Professional Experience
present activities and achievements (1998 onwards)
joined saudi aramco, largest oil producing company in the world, dhahran on 7th august 1998 as planning engineer in the facilities planning department, pipelines group. working as lead pipeline engineer to plan and design entire pipeline facilities of various projects.
last three year, sworking as team leader in many grassroots pipeline projects. job involves:
brainstorming, conceptual project planning and scope development
study of alternatives, coordinations with related studies team members
pipeline hydraulic modeling and sizing; evaluate all options (networking, looping etc.). softwares used (pipephase, stoner)
Finalize dbsp (design sasis scoping paper) and front end design report
Optimization study for project economic evaluation through technical scope definition, execution strategy, schedule and life cycle cost.
presentation to the management and obtain approval.
issue of dbsp for project execution
follow up with project management team during detail design and execution
past activities and achievements (1977 to 1998)
started my career in september 1977 as field production engineer in the oil and natural gas corporation (ongc), india a fortune 500 company. major activities were:
1. planning & project activities (1994 - 1998)
technical and strategic planning, economic evaluation and preparation of project feasibility reports; planning and co-ordination with consultants and engineering planning group; documentation for budgetary approval and investment clearance from govt. authorities; post-completion study of projects of projects. major project handled:-
phase-III sour gas processing expansion project
Contractor - m/s. daelim of south korea and m/s. sumitomo of japan.
Phase-IIIA sour gas processing expansion project
Contractor: m/s. hyundai heavy industries co. ltd.
softwares used: primavera and ms project.
2. Plant commisioning and operations (1993 - 1987)
lpg
gas sweetening
gas dehydration
dew point depression
sulfur recovery plant
3. material management (1987 -1984)
procurement planning, preparation of tender documents, technical evaluation, foreign exchange clearance, and other material management activities (for 2 years)
4. Field operations (1984 - 1977)
Eductation
bachelor of engineering (mech.) 1976 first class from jadavpur university, calcutta, india
m.tech. (by research) in industrial engineering and material management from indian school of mines, dhanbad. (part-1 completed.)
Topic: Management of Equipment System for Oil Field Exploitation
Certification
professional trainings
a) primavera project planning
b) pipephase and tacite simulations
c) best practices of project management
d) project management from mdi, gurgaon, india
e) import/export policies from bmc, baroda
f) computer applications project management, india
g) energy management nitie, bombay, india
h) Effective Communication ongc, india
i) oil and gas safety, ongc, india
technical papers
a) replacement of capital items and standardization of oil field equipments
b) how to increase work over index to 9.0 in eastern region
c) energy conservation by steam management
d) Oil Production Optimization
prepared many other reports on operational trouble-shooting
Additional Information
some of my recent mega projects:
khurais downstream pipelines for khurais field development program. this includes crude, gas and ngl pipelines.
this is a multi billion dollar program. the program includes new grass-root crude oil processing plant, drilling and field development, water injection support, maintain potential and infrastructure developments.
khursaniyah upstream and downstream pipelines for khursaniyah field development program. this includes crude, gas and ngl pipelines.
this is a multi billion dollar program. the program includes new grass-root crude oil processing plant, new gas processing plant, drilling and field development, water injection support, maintain potential and infrastructure developments.
ngl pipeline capacity increase
detail simulations for 1200 Km pipeline; evaluate intermediate pump station requirements and looping.
Hot Categories
Chemicals
Batteries