Egypt Zones accountACCOUNT

Senior process engineer \ commissioning leader in the profile of upstream oil&gas facilities


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 15 years
Relocation: Yes - Internationally

Industry Experience
15 years Process Engineer

Career Objective

senior process engineerr\engineering leader\comissioning leader

Professional Experience

2003 – PRESENT
OBRIAFU/OBRICOM GAS PLANT & IRRI FLOW STATION
SAIPEM / NIGERIAN AGIP OIL COMPANY
SENIOR PROCESS ENGINEER \ COMMISSIONING LEADER

Responsibilities included:
•Developed process documents for following new package: glycol gas dehydration unit, high capacity centrifugal compressor, fuel gas heaters, oil pre-flash drum, nitrogen service unit and lube oil cleaning systems for turbine and compressors.
•PFD, P&IDs, equipment data sheet: glycol contactor, glycol regeneration package., heaters and pumps )
•Elaborated flare and blowdown philosophy; finalized cause & effect chart and ESD-PSD block diagram
•Prepared operation manuals
•Member of project HAZOP/HAZID team.
•Coordinated site-engineering activities for pre-commissioning, commissioning and start-up of new units.

2001 – 2002
BORANKOL GAS PLANT
ASCOM / TOLKANNEFTE GAS KAZAKHSTAN
SENIOR PROCESS ENGINEER \ ENGINEERING LEADER

Responsibilities included:
•Elaborated basic and details engineering for the new plant had consisted of : two stage gas separation units, the last at low temperature, one condensate stabilization tower, one engine-compressor for low pressure gases, condensate storage tanks, condensate transfer pumps, methanol injection pumps with methanol storage vessels and fire fighting system ( main ring, pumps and water tanks)
•Managed the project liaisons and collaboration between the technical departments.

1999 – 2000
BUTIMANU COMPRESSOR STATION
ROMGAS ROMANIA
SENIOR PROCESS ENGINEER \ ENGINEERING LEADER

Responsibilities included:
•Analyzed underground gases storage system and settled the technical solutions for integrating the new compressors with the existing facilities.
•Established main sequences of compressors operation together with Vendor engineering team at Dresser factory from Le Havre/France.
•Prepared process documents for the utilities required to the new compressors installation.
•Issued pre-commissioning, commissioning and start-up procedures.

Eductation

1978 Secondary School of Chemistry Ploiesti
1985 Oil and Gas Institute Ploiesti
Master Engineer in the Profile of Petroleum
Specialization in Oil and Gas Deposit Recovery & Well Drilling

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.