INSTRUMENT TECH./ ELECTRICAL TECH. AND ELECTRONIC TECH. CV.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
RESPOSIBLE TO DO THE DUTIES
Professional Experience
WORKING AS A INSTRUMENT TECHNICIAN MAINTENANCE IN ARAMCO REFINARY.
Eductation
EDUCATIONAL BACKGROUND:
TERTIARY EDUCATION
1990-1992
GENERAL RADIO COMMUNICATION OPERATOR (G.R.C.O)
NAGA COLLEGE FOUNDATION NAGA CITY CAMARINES SUR PHILIPPINES.
1986-1988
ELECTRONIC/ELECTRICAL TECHNICIAN
RIZAL TECHNICAL INSTITUTE NAGA CITY CAMARINES SUR PHILIPPINES
SECONDARY EDUCATION
1981-1986
SAN FERNANDO BARANGAY HIGH SCHOOL, SAN FERNANDO CAMARINES SUR PHILIPPINES
PRIMARY EDUCATION
1976-1981
GRIJALVO ELEMENTARY SCHOOL, SAN FERNANDO CAMARINES SUR PHILIPPINES
Additional Information
Project Title: Maintenance Instrument at distribution plant ARAMCO Project.
• DCS System Advant ABB. Open Control System, Safety Shutdown System.
• Perform Shift Schedule & Carried Out Routine/Breakdown/Shutdown/Start-up & Trouble Shooting.
• Perform Preventive maintenance on Instrument, Control System and Safety System.
• Calibration of Sensing Element and Final Element
• Trouble shooting and repairing of motor pumps
• Trouble shooting of UPS
• Calibration of meter by using PROVER Tank at in Truck Loading Area, location South Jeddah Bulk Plant
February 2002-June 2002
Date:
JAMJOOM WESCON S.A CO. LTD. INSTRUMENT TECHNICIAN
Employee: Position:
Project Title: SAMREF Upgrading Project Furnace and Compressor Area
• Calibration of new instrument and control valve, demolition of instrument, installation and loop checking activities.
• Installation of ICS Triplex TMR Programmable Logic Controller and LD DUIKER ignition system.
• Testing of vibration probes (horizontal & vertical) both linearity and vibration.
• Commissioning activities.
Project Title: SAMREF Upgrading Project Alkylation Area
• Demolition and installation of all control valve and thermocouple instrument.
• Installation of new level transmitter, loop checking, functional test and commissioning.
Hot Categories
Chemicals
Batteries