Instrumentation Engineer Resume with 5 years Petro chemical Design/EPC Experience - From Muscat
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
Looking for a good opportunity in the region of Middle East/Canada/Singapore/Malaysia/Australia/UK and USA, both Offshore/Onshore Job which will provide highly potential job environment to learn, to prove my potential and earn in my future.
Professional Experience
Job Summary:
4 Years 7 months experience in Instrumentation Errection and Commissioning, Detail Engineering and Procurement activities for Turn-Key Projects in the field of Petrochemical Industries with a notable number of assignments in abroad and in India.
Professional Experience:
A) Presently working in OMAN NATIONAL ELECTRIC CO(S.A.O.G), Muscat, Sultanate Of Oman, as a INSTRUMENTATION ENGINEER from 02/07/2005 to Till Date.
B) Worked with DAELIM INDUSTRIAL CO LTD, Mathura Refinary, Mathura(U.P) as a INSTRUMENTATION ENGINEER from 13/09/2004 TO 22/03/05.
C) Worked for CHENNAI PETROLEUM CORPORATION LIMITED, chennai as a INSTRUMENTATION ENGINEER through Instrumentation Maintenance And Errection Tech Pvt Ltd, Chennai from 01/07/2001 to 30/08/2004.
Major Project Handled:
1) Project Title : 1500 M3/Day Capacity Reverse Osmosis Plant
(Presently Handling) : 200 M3.Day Capacity De-Mineralised Water Plant
End User : Petroleum Development Oman. LLC, Sultanate of Oman.
2) Project Title : 6000 M3/Day Capacity Reverse Osmosis Plant
: 100 M3.Day Capacity De-Mineralised Water Plant
End User : Petroleum Development Oman. LLC, Sultanate of Oman.
3) Project Title : 1.8 MTPA DHDS / 60 TPA HGU Upgradation Project
End User : Indian Oil Corporation Limited, Mathura Refinary, India.
Job Profile:
* Verification of Detailed Engineering Documents which includes PFS&PEFS (P&ID), Instruments Tag list, Instruments and JB location Layout, Instruments Cable trench and Tray layout, Instruments Cable schedule, Functional Logic Diagram and Loop Diagrams, Panel Wiring Diagrams and PLC Specification.
* Preparation of Control and Automation Philosophy, Cause & Effect diagram, PLC I/O list, Instruments Data Sheets, Hook-UP drawings, Instruments Name Plate drawings, Instruments Engineering Data Sheets, and preparation of As-Built of above documents.
* Co-ordinating with Procurement activities for all type of instruments, control valves, on-off valves, instruments fittings and Programmable Logic Controller and raising BOM and Floating enquiries to Vendor & Vendor follow-up for budgetary cost estimation and preparing MAS.
Eductation
Academic Qualification:
* B.TECH in INSTRUMENTATION ENGINEERING from MADRAS INSTITUTE OF TECHNOLOGY, ANNA UNIVERSITY, CHENNAI, passed out in July’ 2001
* Did HSC and SSLC from H.N.U.C.Hr Sec School, Tamil Nadu, with 85% and 80% aggregate respectively.
Certification
Additional Qualification:
1) Auto Cad -2000
2) Well conversant with MS-Office tools
3) Certificate holder of Health, Safety And Environment ( HSE)
4) Certificate holder of Job Hazard Analysis
Additional Information
* Errection and Commissioning of all field instruments (Pressure, Temperature, Flow and level instruments), Control Valves, On-Off Valves, ESD Valves.
* Performed Loop checking, ESD Logic checking, functional checking and Sequence checking for RO/DM plants in Siemens make Programmable Logic Controller.
* Carried out Pre-Commissioning and commissioning of RO & DM plant
* Carried out Site Acceptance Test for Siemens make Programmable Logic Controller system and Instrumentation related items.
* Carried out graphics checking, set point verification, tag assignment verification, preparation of loop wiring diagram, hard wiring establishment in Yokogawa India Limited make Distributed Control System (Centum-CS 3000) and Programmable Logic Controller (Triconex) and Performed loop checking, ESD logic checking and functional checking for Compressure units.
* Worked in Yokogawa India Limited supplied Hart Monitoring System - Basic setup creation in main window, Instruments connection establishments through HART COMM window or DATA BASE window, Adding instruments in database and editing all instruments information in database
* Preparation of all Test Packs which includes instruments calibration report, installation report, JB installation report, cable continuity checking report and Loop checking report. Supervision of site construction activities and maintaining daily/weekly progress report.
Hot Categories