More than fifteen years experience in Electrical work.Commissioning, Installation,Operation
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
Electrical Commissioning Supervisor / Electrical Maintenance Engineer / Power Engineer
Professional Experience
§ Performs commissioning in subsystem functional testing on electrical automation,and loop functional reliabilty. Supports work on SCADA (Supervisory Control and Data Acquisition) system of
the plant using an LT-6 relay and RS485 MODBUS communication protocol.
§ Start- up 6.6KV and 480V motors,check phase rotation,conduct insulation test for the cables
and motor windings.Satisfy logic from control to PLC thru DCS (Distribution Control System).
§ Performs the necessary modification upon approval of the engineering department
§ Supervised 12 E & I technician for the installation of the approved project came from the client ExxonMobil or Affiliate. Coordinate with the modification engineer discuss the content of the proposed project .Arranged the materials needed to complete the project.
§ Commissioning & Start-up of Gas Turbine (A,B,C,& D) with dual firing frame 6.B speedtronic
control with a maximum power output of 42.1MW in natural gas and 41.16MW in distillate oil,
with a speed of 5163/minute, model PG6581B by GE Energy Products.
§ Red Line Drawings and As Built Documentation after conducting field inspection and testing. Prepares the necessary loop drawings of the electrical and instrument device system of each four (4) combustion turbines, as required by the client (Exxon Mobil) for proper turn over.
§ Designed gas turbine electrical and instrument loop diagram for Chad development project.
§ Start –up Miandoum gathering station,June.2003.Start-up Kome gathering station,Central treating facilties, Kome pump station 2, Feb.2004
§ Install Instrument device such as control valveL,pressure safety valve,LT,TT,PT,FT,LS,TS,PS,FS,solnenoid valve, ect…
§ Assist Alstom with the 33KV, and 66KV switchgear. Test protection relay logic, capacitor bank
visual control and insulation prior to energising. Check all CT for proper phasing.
§ Assist Schneider 6.6KV and 480V substation for the proper testing of all power distribution
load.Test all CT’s and VT’s, check for proper phasing, and make a ratio test.
§ Responsible for the operation and maintenance of gas and diesel engine caterpillar generators
of global maintenace project in Nigerian AGIP oil company.
Eductation
Educational Background and Qualifications
Bachelor of Science in Electrical Engineering (BSEE), 1984
Adamson University, San Marcelino, Manila, Philippines
Registered Electrical Engineer
PRC License No. 0006438
Life Member-Institute of Integrated Electrical Engineers of the Philippines, Inc.
Certification
will be sent when needed
Additional Information
Work Summary
Inclusive Dates Company & Position
Sept.6, 2005 Electrical & Instrument Supervisor
to Jan.12,2006 TCM- IMI ( ESSO Eploration Petroleum Chad
Incorporated).Chad Africa
March.02, 2003 Senior Electrical Commissioning Technician
to July.30,2005 TCC/TCM - IMI (Oil and Gas Power Plant)
KBR ESSO Chad Development Project
November 2001 to Electrical Maintenance Engineer
November 2002 JKPEEZ Impex Co. Ltd. (AGIP Oil Company), Nigeria.
February 1999 to Power Foreman
October 2001 Lucent Technologies Saudi Arabia
May 1992 to Electrical Technician I/ Crew Leader, Grade Code 10
January 1999 Saudi Arabian Oil Company (Saudi Aramco), K.S.A .
May 1991 to Power Generator Optr.Technician // Saudi Amoudi Group Co.
March 1992 Peace Shield Program under Boeing Supervision,
P.O.Box 56880, Riyadh 11564,
Hot Categories
Chemicals
Batteries