Egypt Zones accountACCOUNT

Instrumentation foreman


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 9 years
Relocation: Yes - Internationally

Industry Experience
3 years Field Engineer
3 years Field Engineer
4 years Field Service Technician

Career Objective

To be a Truthful and Hardworking Professional to complete my job with class and to work industriously with Patience and Self-confidence learning and creativity provides espouse to New Ideas and stimulates Personal and Professional Growth.

Professional Experience

1.Name of the Concern : SHELL-PDO ( PETROLEUM DEVELOPMENT OF OMAN ) for HARWEEL Oil & Gas Exploration Site Commisioning Project through HOFINCONSME in OMANFrom date to date: 13.08.05 TO Till Date Designation : ENGINEER ( Instrumentation Department) Role: : Erection and commissioning of the Upstream OIL exploration Instruments for the HARWEEL Oil Exploration Site esponsible for maintenance and troubleshooting of various INS such as temperature, pressure, density, flow, level, differential pressure, temperature switches and transmitters, Batch controllers, scanners, flow meters, control valves, ESD valves, Fire & Gas products such as smoke, fire and flammable toxic gas detectors. Also responsible in attending to various DCS and PLC related tags, ESD, F&G Logics and Cause and Effect chart. Responsible for modifications and technical coordination with respect to SAP implementation and suggestion on tagging standards and hooking up the same in the DCS and IPF SYSTEM ( FAST TOOLS, STARDOM)
2. Name of the Concern : ARKAY ENERGY Ltd., through OPERATIONAL ENERGY GROUP INDIA PVT LTD From date to date: 15.11.2004 TO 10.08.05
Designation: Engineer (Control & Instrumentation Department) Role : Erection and Commisioning of the 120 MW Combined Cycle Power Plant and Commissioning of the Equipments Like the Fire Detectors Lube Oil PCV`s and all the Gas Turbine Protective Systems, and the Gas Turbine Control Instruments ,GBC Commissioning and all other Instrumentations related with the Gas Turbines, 3.Name of the Concern : SUPREME RENEWABLE ENERGY LTD., From date to date: 01.09.2001 TO 15.11.2004 Designation: JUNIOR ENGINEER Role: Erection and Commissioning of the 2 X 20 MW Coal based Power Plant. Commissioning of Process Instruments in the Site like Pressure Transmitter, Temperature Scanners, Program preparation and modifications, Graphics preparation and modifications, Logic Chart preparation and modifications,
Functional block preparation and modifications, Annunciation function preparation and modification, Sequence table preparation and modification, Nest Allocation through IOM Builder,
Field Wiring to Marshalling Cabinet in , DCS (CENTUM CS 3000 ) for 100 * 2 tonnes BOILER4. Name of the Concern : TERRA ENERGY LTD.,
From date to date: 01.03.1997 TO 31.08.2001Designation: INST. SUPERVISOR

Eductation

Sr. No Exam Discipline/Specialization University /School Percentage Obtained Year of Passing
1



2 Diploma in Electronics& Instrumentation
S.S.L.C Electronics & Instrumentation


English,Mathematics,Science The Salem Polytechnic


The Little Flower Higher Sec School 80 %



75 % 1997

1994

Certification


DCS CENTUM CS 3000 & CS 1000 Engineering and fundamental- YBL

NAGMAN INSTRUMENTS training certificate for all Instruments and Master Calibrator calibration training.

H2S Awareness & Escape Safety Certificate for Oil Exploration Site Entry

Additional Information

Quantification and estimation for requirements of field and control room instrumentation and control system, technical bid evaluation, technical discussions with vendors, procurement and inspection, erection and commissioning for instrumentation involving multi-disciplinary team coordination.
DCS/ESD system/Field Multiplexer/PLC’s system erection, commissioning, fault diagnosis, adding of I/O’s, generating graphics, generating logics, sequence tables, alarm annunciation tables.
Design Control applications, Interlocks, test & implement at site.
Preparation of Input/Output list and I/O assignment.
Preparation of Specification sheet for the field Instruments.
Preparation of the G.A and wiring drawing of the control panels and power distribution panels.
Preparation of the Cable schedule, Cable termination details.
Preparation of cause and effect matrix, Loop dwg. and P&ID.
Process study and P&ID review
Online/ Offline maintenance, trouble shooting and calibration of field instruments like flow transmitters, level switches, level transmitters, pressure transmitters, analysers, control valves, pressure switches, flow switches etc.
Erection commissioning of Gas Turbine generators in combined cycle mode with Heat Recovery Units.
Erection and commissioning of Reciprocating Gas compressors (KWANG SING )having Digital Governing system for speed control, Bently-Nevada Machine monitoring system.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.