Egypt Zones accountACCOUNT

assistant driller


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 5 years
Relocation: Yes - Internationally

Industry Experience
5 years Driller

Career Objective

I am an Assistant Driller with 5 years drilling experience in land rigs with both local and international experience, using varco TDS.

Professional Experience

WORKING EXPERIENCE
1. Organization: RAWABI DALMA ENERGY & CO. LLC
AL-KHOBAR, SAUDI ARABIA.
Period: January,2006 –Till date.
Dept: Drilling
Position: Assistant Driller
Job Description:
• Maintenance and repairs on drilling and associated Equipment.
• Trip monitoring.
• Assist in planning and preparing equipment for next drilling operation.
• Reading and interpretation of gauges related to drilling equipment.
• Assisting the driller in operating drilling and mud circulating equipment.
• Carrying out departmental daily check list (e.g. Choke and kill manifold setup, mud pump inventory etc. )
• Preparation and tallying of tubulars, BHA , etc.
• Rig move.
• Reporting drilling operation in IADC reports.
• Check mud weight and viscosity and informing the driller on any changes from the normal drilling programme.

2. Organization: KCADEUTAG DRILLING (NIG) LTD
Period: July, 2003- January, 2006
Dept: Drilling
Position: Assistant Driller
Job Description:
• Maintenance and repairs on drilling and associated Equipment.
• Trip monitoring.
• Assist in planning and preparing equipment for next drilling operation.
• Reading and interpretation of gauges related to drilling equipment.
• Assisting the driller in operating drilling and mud circulating equipment.
• Carrying out departmental daily check list (e.g. Choke and kill manifold setup, mud pump inventory etc. )
• Preparation and tallying of tubulars, BHA , etc.
• Rig move.
• Reporting drilling operation in IADC reports.
• Check mud weight and viscosity and informing the driller on any changes from the normal drilling programme.

b. Derrickman
Period: July 2002- July 2003
Job Description:
• Carrying out routine inspection on stabbing and monkey board.
• Monitor mud pumps and pits during drilling operations and informing the driller on any changes.
c. Floorman
Period: Sept. 2001- July 2002
Job Description:
• Playing of rig tongs and spinner.
• Arranging drilling tools on the rig floor.
• Monitoring shale shaker and changing screen.

3. Organization: Sanya Grammer School, Ijeshatedo-Surulere, Lagos.
Period: July 2000 – July 2001 (NYSC)
Dept: Teaching (Geography)

Eductation

ACADEMIC HISTORY WITH DATE

1995-1999 University of Calabar, Cross Rivers State.
1989- 1994 Bereton College Port Harcourt, Rivers State.
1985-1988 Rivers State University Of Science And Technology
(RSUST) Staff School, Port Harcourt.
1981-1985 Anglo- American School(AAS), Moscow, USSR.
1980-1981 British American Play Group School, Moscow, USSR.

SUMMARY OF QUALIFICATION

1999 B.Sc. (Hons) Geology.
1994 West African School Certificate (WASC).
1988 First School Leaving certificate (FSLC).

Certification

COURSSE/ TRAINING PROGRAMME SPONSOR
Jan.2006 H2S Training RAWABI DALMA & CO.
First Aid Training RAWABI DALMA & CO.
HSE Training (PTW,STOP, etc) RAWABI DALMA & CO.
Oct.2004 International Well Control Forum (IWCF) KCADEUTAG NIG) LTD
July 2004 First Aid Training KCADEUTAG NIG) LTD
June 2004 Stuck Pipe Prevention Course GlobalSantafe (Nig) Ltd.
HSE Training KCADEUTAG NIG) LTD
May 2004 Basic Drilling/Introduction to Well Control KCADEUTAG NIG) LTD


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
800-Drilling Artificial Lift » News » Cementing, Stimulation » News » Directional Drilling » News » Drilling » News » Drilling & Well Services » News » Drilling Engineering & Equipment Systems » News » Logging, Perforating, Testing » News » Offshore Drilling » News » Reservoir/Completion Consultants » News » Workover & Well Services » News » Workover Rigs/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.