Well site well intervention opertaions supervisor5stimulation: fracturing and coiled tubing)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 13 years
Relocation: Yes - Internationally
Career Objective
I am currently seeking a opportunity in Wellsite Supervision - Consulting in stimulation Operations – operation coordinator - Business Development, Contract, or Full Time in algeria or International.
Professional Experience
Jan 2009 - Present – Coiled tubing and fracturing operations supervisor (design and execution)in Algeria with SONATRACH as a client representative .working in collaboration with Halliburton ,Schlumberger and BJ stimulation crews.
I was involved in all Coiled tubing operations, including :velocity strings,temporary pipelines, Well interventions, including Tube Clean Acid ,MATRIX acidizing, solvents ,Foam clearouts Reformat & other solvents, Stim tube, Killing, Kicks off, Drilling, Logging, milling & fishing with Coiled tubing using spears or Overshot. Drilling cement after tieback job using 2 in CTU ,Clean out Horizontal wells ,about 1000 m Open hole section in the drain ( Horizontal section
Nov 2010 – Present – consultant Instructor with NAFTOGAZ (SONATRACH training center) in hassi messaoud covering well intervention operations during: days off time.
Dec 2006 - Jan 09 Coiled tubing and Fracturing well site operations supervisor ( Consultant)
with Halliburton in middle east Oman.
Perforations stage by stage for preparation of the zones for Frac.
Well Site Supervision as a night company man.
Sept 1997- Dec 2006 Stimulation Operations supervisor (design and execution)
in Algeria with SONATRACH as a client representative
Eductation
• BSc In Electro technical Engineering, University of Bejaia Algeria after 5 years
• Field engineer from Schlumberger training centers (Kellyville:Oklahoma USA and UTC Uk) after a duration of 30 months .Covering cementing ,coiled tubing ,fracturing and directional drilling courses with 3 periods of organization :Pre-School , School and post school with a final examination of each period (theoretical and practical side)
•Well intervention and well control courses with Boots & Coots in 2010.
Certification
Current Well Control Certification IADC
H2S Certificate from Muscat oman (expired)
Project Management with Petro-skills.
Coiled tubing, cementing, stimulation (Frac) and directional drilling certification from Schlumberger.
Additional Information
Skills:
Fracture Stimulation (design and execution)
Wellhead Isolation
Fishing with wire line or coiled tubing
Hole Hunting / Squeeze Cementing for bad cement remediation
Well Control
Safety/ HSE
Well Site Management
Horizontal Well Completions / Electric Wireline Pump down Perforating
Coiled Tubing / Multi-lateral well clean out and stimulation with Discovery MLT Schlumberger tool on hassi messaoud.
Perforating and Fracturing Multiple Zones in same well (over 10 zones in middle east oman)
Responsible - Accountable - Self Motivated
_ Knowledge Sharing. Intermediate
_ Listening skills. Advanced
_ Extensive exposure to planning and supervising well site operations in oil field
_ Multilingual: English , French, Arabic
¬_ Gained a little Experience in training (well intervention techniques)
_ PDO HSE passport passed successfully in 02nd December 2006 in Muscat OMAN.
_ PDO safety driving license
_ 01 Week with K.Nolt doing Evaluation of Fracturing in KTC USA.
Hot Categories
Chemicals
Batteries