Petroleum Engineer, Production Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Petroleum Engineer, Production Engineer
Professional Experience
1997?V2006 Karachaganak Petroleum Operating b.v. Aksai, KZ
Petroleum Engineer
„X Supervision of production well testing activities using the production test separators. This also includes the supervision of the multiphase metering facilities.
„X Supervision of production logging operations in producing wells.
„X Ensure the completion of static pressure surveys in producing well stock.
„X Validation and reporting of data from production tests, production logs and static pressure surveys.
1996?V1997 KarachaganakGasProm Aksai, KZ
Geologist
„X Supervise the running of open-hole logging operations.
„X Supervise coring operations.
„X Supervise the running of the core store including geological laboratory.
„X Ensure that drilling activities are reported on a daily basis to the Development Team and that the final well reports are issued in a timely fashion.
1993?V1996 KarachaganakGasProm Aksai, KZ
Production wells foreman
„X Plan and supervise well production operations in order to control, monitor, and report about availability and integrity of the facility, production parameters, and maintenance activities.
„X Assess daily operation and maintenance problems and coordinate corrective actions to ensure the continue availability of the fasility.
„X Plan and supervise start up operations, tests, and shutdowns of the wells.
1991?V1993 KarachaganakGasProm Aksai, KZ
Production wells operator
„X Perform all activities necessary for the safe and efficient operation of the well and well site facilities.
„X Take instructions from the Production Wells Supervisor or Wells Foreman and, without further input/support, be capable of maintaining a safe working practice.
„X Monitor and adjust flow rates, temperatures, pressures and other production or process parameters.
„X Monitor the performance of all equipment, instrumentation, controls, and protective devices.
„X Inspect the condition of all equipment, instrumentation, controls, and protective devices and ensure repairs are made as needed.
„X Analyze and correct operating problems or obtain help for problems that cannot be corrected with own resources.
Eductation
1990?V1996 Atyrau Oil and Gas Institute Atyrau, KZ
„X Petroleum Engineer, (Oil & Gas geology)
Certification
2004 KBTU(Heriot-Watt niversity) Almaty,KZ
„X Petroleum Engineering
„X Production Technology
„X Formation Evaluation
2000 Schlumberger Training Center Baku, AZ
„X Well Log Interpretation Course
1999 Schlumberger Training Center Aksai, KZ
„X Well Cementing & Stimulation Course
„X Casing hardware, CemCADE, Cement plug, Cementing additives, Cementing chemistry, Cementing lab, Criteria for successful Cementing, Evaluating cement jobs, Gas migration, Horizontal cementing, Mud removal, Primary cementing, Remedial cementing, CemCRETE, Instanseal, SqueezeCRETE, UniFLAC.
„X Acidizing Additives, Nitrogen services, Introduction to well stimulation, Zonal coverage, StimCADE, Welltest.
1998 Agip Training Center Milan, Italy
„X Multi-phase Flow-meter Course
Additional Information
Russian ?V Fluent
English ?V Fluent
Kazakh ?V Native
Hot Categories
Chemicals
Batteries