WELDING OR MECHANICAL INSPECTOR
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 13 years
Relocation: Yes - Internationally
Career Objective
WELDING OR MECHANICAL OR NDT INSPECTOR
Professional Experience
Experience above 12 years:
Recently Working SGS Gulf DUBAI As a third party Inspector.6
1: OLAYAN DESCON Engineering Industrial Company
Al Jubail (KSA)
Position: welding /Mechanical Inspector
December 2003 – April 2006
Turn around& Units shutdown
Responsibilities
Hydro testing inspection and witness, hydro jetting, decoking, modification, piping cleaning. New piping installation, hydro testing of piping, N.D.E. examinations, and coordination with third party.
YEAR 2005
Fabrication OF SHELL &TUBE HEAT EXCHANGER for TECHNIP/SAUDI ARAMCO Fabrication according to ASME VIII DIV.1
Fabrication of pressure vessels “U” stamp 23 nos. for (TECHNIP/SAUDI ARAMCO)
End user SAUDI ARAMCO HARADH Fabrication according to
ASME Sec. VIII
Fabrication OF column /tower for SNC-LAVALIN end user GULF FRABI PETROCHEMICALCO. LTD. Fabrication according to ASME VIII DIV.1 (05 Nos)
Pressure drum for (J. G.C) Project: JUBAIL CHVREN PHLIPS
According to ASME SEC.VIII “U” STAMP JOB.
Responsibilities
Material verification according to design, surveillance inspection during welding, stage inspection, final visual dimension inspection, hydro testing, surface preparation and paint application inspection during and final.
YEAR 2004
Working as a Welding/Mechanical Inspector at S.M.J Project Jubail Saudi Arab.
Responsibilities
Material verification according to design, surveillance inspection during welding, stage inspection, final visual dimension inspection, hydro testing, surface preparation and paint application inspection during and final.
2: Bureau Veritas (France) Pakistan Branch.
131 new garden town ali block Lahore.
January 2003 to December 2003.
Position: industrial surveyor
Projects: Gas conversion plant at rouch power Abdul Hakim distt khanewal.
Schlumberger Islamabad (workshop)
Manufacturing of white oil pipeline at Data steel pipe industry Saiqabad.
4: Babcock & Wilcox international INC.
December 1997 to November 2001
Position: QA/QC Inspector.
Project: Saba power plant 125 mw oil fired farooq Abad distt Sheikhupura
Eductation
Education:
FSC with mathematic from Lahore board.
Three months short period course in computer application word & excel.
Awareness training of ISO 9000 from DESCON engineering LTD.
Certification
Professional Qualification
• CSWIP 3.1# 21602 (Certification Scheme for Welding Inspection Personnel).
Level II in Magnetic Partial testing method Complies with the ASNT Standard CP-189 (1995 edition) and recommendation of the ASNT-TC-1A (1996 edition, 1998 addenda.)
• Level II in Liquid Penetrant testing Complies with the ASNT Standard CP-189 (1995 edition) and recommendation of the ASNT-TC-1A (1992 edition, 1996 addenda.)
• Level II in Radiography testing method Complies with the ASNT ASNT-TC-1A (1996 edition, 1998 addenda.)
• Level II in Ultrasonic testing Complies with the ASNT recommendation of the ASNT-TC-1A (1992 edition, 1996 addenda.)