Career Objective
I take pride of what i do. a team player who coach, mentor and motivate to achieve
Professional Experience
I am a civil engineer with trackable 30 years of industrial construction experience mostly in petrochemical facility where I am still working for last 27 years.
Only reason that I am looking for a new job is that my family is now relocated back home in Canada
It is difficult for me to list the type of project that I have handled directly or looked over as a senior manager.
- I work in both green and brown fields
- I did maintenance and new constructions.
- I do medium size projects up to 100M.USD
- I have controlled up to 12000 work force at a time
- Biggest construction is 72000 m2 polyethylene storage facility
- I do industrial, residential and leisure construction
- I do front-end project so that I am involved in all project stages but I am in-charge for construction.
- I deliver on time, on quality and on cost. i have done millions of hours LTA free.
- It regularly travel, I can relocate and it is common to do 12 hours daily.
- My comfort zone is wide to include all type construction works civil, mechanical, electrical and automation. However, I have no offshore experience.
I have passion to achieve.
Following either done by me or udner my supervison:
• Hundreds of small modifications including electrical, instrument, mechanical and civil.
• Hundreds of average size projects including complete units, sub-units, steel and GRP/GRV/GRE pipelines up to 60", storage tanks, columns, coolers, vessels, exchangers, compressors, pumps, overhead cranes, substations, control systems, analyzers, buildings, shelters, road works…etc.
• Construction management for The following projects
1- Incineration plant
2- Effluent Treatment plant
3- DMDS injection facility.
4- Bagging and loading facility.
5- Compressed air facility.
6- Storage facilties.
7- Chiller plants.
8- Seawater cooling plant.
9- Sewater deslenation plant.
10- Sewage treatment plant.
11- Wet air oxidation treatment plant.
12- Seawater chlornation plants.
13- Multiple new electrical substation and multiple replacement of switchgears
• Four general turnarounds in petrochemical facilities
• Social and sprots club.
• 72000M2 products store.
Eductation
1990 Bachelor of Science in Civil Engineering May 1990. Al Azhar university (Egypt)
2017 Cetrifed professional manager Robert Gordon university (UK)