Drilling Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
Seeking a job in an international Co.
Professional Experience
„« SINCE JAN. 2005 WORKED AS DRILLING AND WORK-OVER ENGINEER, MAKING DRILLING AND WORKOVER WELLS PROGRAMS WITH KHALDA PETROLEUM COMPANY
„« Company : KHALDA PETROLEUM COMPANY
„« A joint Venture Company Was Established In 1986 Among E.G.P.C., APACHE Recent. One of The Best Oil and Gas Exploration, Development, and Production Operating Company in the Western Desert of Egypt. Established the Safest and the Lowest level of Well?¦s cost (Vert. and Direc.) Drilling (Expl. & Develop.) and Completion Operations Cost for the different Depth Ranges (7500' Up to 16000').
„« Drilled the First Two Horizontal Wells in Egypt and Establish the Biggest Gas Production Project in the Western Desert. Performing the Different Optimized Wells Work-over Operations.
1) Prepare the Drilling Operations Well Plan Package Including:
- Expenditures Estimation. - Directional Plan, & Equipment.- Casing / Liner Design. - Cementing Program Design.
- Mud Program Design. - Drill String and BHA Design. - Bit Selection And running. - Hydraulics Design. - Well Head Selection. - Well Test (Production and D.S.T.) Program.
- Single Or Multiple Zone Completion (Oil/Gas Producer, WIW,WSW) String Design and Operation Program. - P & A , T. A PROGRAMS 2) Prepare the Expenditures and Program for the following Work-over Operations:
- Pump (ESP) Installation and Replacement. - Recompletion. (Plug Back, Zonal Isolation with Packer(s), etc.). - Producing Interval Remedial Works and Stimulation. (Reperforation and Adding Perf's, Water Shut-off, Fracturing, etc.). - Well Bore Remedial Works. (Csg. Damage and Leak, Second. Cement Jobs, etc.). 3) Daily Operations Managing and Final Reporting. - Drilling and Completion Equipment Forecasting and Stock Managing. - Updated and Proper Technology Selection for The Operations Cost Optimizing. 4) Drilling and Work-over Rigs Supervision To carry out the execution of all the above jobs on the rigsite 5) Follow-up daily rig operations ( 11 DRLG RIGS AND 8 W.O RIGS), analyze the problems and recommend the proper most economic technical solutions after discussion with service companies.
Eductation
Certificate Obtained: B.Sc. Of Petroleum Engineering, July 2004.
University Name: Cairo University.
Cumulative Grade of Appreciation: Very Good With Honor Degree.
Graduation Project Degree: Distinction.
Certification
„X Summer Training at Halliburton Energy Service Co. (September, 2002).
„X Summer Training at Khalda Petroleum Co. in Sumpetco Field (July, 2002).
„X Summer Training at Petrol Belayiem Co. in Abu Rudies Field (August, 2003).
„X Summer Training at Khalda Petroleum Co. in Salam Field (July, 2003).
„X Visit for one day to Schlumberger Training Center (ETC) (March, 2003).
„X Visit for two days to GUPCO Petroleum Co. in Ras Shokiar (April, 2004).
Additional Information
Awarded the Distinguished Student Award from SCHLUMBERGER LOGELCO INC.
Participated in presentation(part of my project),the topic was about Deepwater Drilling.
I am one of the first ten graduated students from my department (5th).
Hot Categories
Chemicals
Batteries