Pre-commissioning/commissioning, start-up and operation of process plants and utilities seeking a career position utilizing my education, experience in process plant operations, and staff training.
Professional Experience
Work Experience
December 2005 - present:SNAMPROGETTI - ITALY WESTERN LIBIA GAS PROJECT
MELLITAH PLANT
Process Operator
• Commissioning, start up and operation of Gas Plant: : Sulphur Recovery Unit;NGL Fractionation UNIT , Water Stripping Plant.Three trains consisting of amine solution absorption process for CO2 and H2S removal , CLAUSS PROCEDURES (thermal reactors), two catalytic reactors ; Deethaniser and Debutaniser. Sour Water Stripper,Surge drum , Air coolers and drain drums, etc.
• Involved in its exploitation, concerned with daily plant operations, inspection of technological equipment.
June 2005 –November 2005:SIRTE OIL COMPANY ATTAHADDY GAS PLANT PROJECT
Senior Field Operator
• Start up and operating of Gas Separation Plant ,capacity 350 mmscfd.Two trains consisting of Product Separator,Condensate Separator,Sandwash system, MDEA absortion process units for CO2 removal,water dehydration unit using glycol package
• Controlling in compliance with scheduled activities and taking properly measures.
• Daily control of all equipment of the Unit, looking for a good seal of system, daily routine jobs.
• Controlling properly running of rotating equipment, checking any leakage etc.
1996-2005
S.C. Rompetrol Rafinare S.A. a company of “The Rompetrol Group” Constanta ,Romania Gas-oil plant
Four Units of Sulphur Recovery,Two Trains Amine Treatment ,Sour Water Stripping Plant
Shift supervisor, in charge with:
• Proposing right solutions to manage each unit according to the Plant Supervisor.
• arameters of the plant.
Promptly inform the Plant Supervisor about possible anomalies and take directly corrective measures, if required
• Supervising on critical situation the team.
• Supervising the start-up of the units, according with the Plants Supervisor requirements, in collaboration with Control Panel and Plant Operators.
• Supervising the plants within the shutdown periods of the plants, according with the Plant Supervisor requirements
.
1992-1996
,S.C. Rompetrol Rafinare s.a. a company of “The Rompetrol Group” Constanta ,Romania
Gas-oil plant
Control Room Operator and Chief Operator - Sulphur Recovery& Amine Treatment
Eductation
EDUCATION
• Foreman for Oil & Gas plant processing ,”Lazar Edeleanu”, Navodari, Romania,1993-1996
• Oil and plant operator, secondary school, ,”Lazar Edeleanu”, Navodari, Romania, 1982-1986