any office job
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Domestically
Industry Experience |
4 years |
|
Other |
Career Objective
to work, part-time or full-time
Professional Experience
JG Summit Petrochemical Corporation
2003 – June 2006
Panel Engineer
Perform the start-up and shutdown, monitor and control of a UNIPOL polypropylene plant (reactor, vent recovery and extruder) using both SHAC and TK catalysts through the Distributed Control System (DCS)
Read and interpret the Piping and Instrumentation Diagram (P&ID) and Logic Diagram for troubleshooting and process improvement
Make reports and presentations on process highlights, plant optimization and cost reduction projects and do revisions of document and procedures
Analyze and solve operational and process problems with the team
Performs supervisory activities in the absence of the supervisor
July 2001 – 2003 Petrochemical Operator
July, 2001 – July, 2002; on-the-job training as part of the Dual Training System of the Gokongwei Brothers Foundation scholarship program
Execute start-up and shutdown activities, lining-up feed streams and transmitters of reactor, extruder and vent recovery in coordination with panel engineer
Responsible for field monitoring of devices and equipment, manual valves manipulation, overseeing maintenance jobs and minor troubleshooting of equipment and instrument
Eductation
2001 - 2002 Gokongwei Brothers Foundation Technical Training Center
Advance Petrochemical Technician Course / Process Instrumentation and Control
1995 – 2000 University of the Philippines at Los Baños
Bachelor of Science in Chemical Engineering
Hot Categories
Chemicals
Batteries