piping stress engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
to work in a competitive stress group and to make the new company to effectively utilise my experience in stress analysis and finding opportunity to learn something new
Professional Experience
Work Experience
a) Current employment : Japan Gas Corporation, Japan.
Projects done
Company : Technip India Ltd.
1. Client : Pars Petrochemical Company, Nargan, Iran
Licensor : Technip France.
Plant : Ethane Cracking Plant(9th Olefin)
Period: November 2001 to October 2002
Responsibilities :
• Analysis done for Aircoolers with nozzle loads checked as per API 661.
• Analysis done for COLD BOX lines with negative temperature goes upto –165oC.
Company : Technip India Ltd.
2. Client : JAM Petrochemical Company, Nargan, Iran.
Licensor : Technip France
Plant : Ethane cracking plant(10th olefin)
Period: November 2002 to October 2003
Responsibilities :
Checking with NEMA Calculations for the entire compressor unit
• Analysis done for Aircoolers with nozzle loads checked as per API 661.
• Analysis & supporting of two phase flow lines.
Company : Technip India Ltd.
3. Client : Saudi Aramco
Licensor: Axens
Plant : DHT Riyadh Refinery.
Period: November 2003 to Feb 2005
Responsibilities :
• Deputy Leader - Stress & Supports.
• Analysis done for Reformer lines.
• Analysis done for Aircooler lines with inlet temperature 430oC.
• Civil information for entire Structure, Piperack for HPU Unit.
• Supporting lines for HPU Unit and clips detailing on vendor drawing.
Company : Technip India Ltd.
4. Client : Qatar Gas & Shell
Licensor: Chiyoda
Plant : Qatar gas II
Deputy Leader Stress for the project
Responsibilities :
• Deputed to Technip Paris as an Area Leader Stress from April 2005 to June 2005.
• Responsibile for Stress & Support activities of Inlet Facility Area
• Follow up of total stress activities of the project with co-ordination to Civil and Mechanical Dept.
• Civil information for entire Structure, Piperack for Inlet Facility Area.
Company : Japan Gas Corporation, Japan.
5. Client : Saudi Aramco
Plant : Rabigh development project
Period: Jan 2006 to till date
Responsibilities :
• Cold Box calculations done for Ethane cracker area.
• Preparation of Nozzle Evaluation Sheet for cold box.
• C-ordination with vendor for the finalization of modeling of inside cold box and finalization of nozzle evaluations.
• Co-ordination with designers for finalization of routing and supports.
Eductation
Education: B.E.(Mechanical Engineering)(1997-2001)
Distinction in Engineering from Madras university.
Studied in SRM Engineering college, chennai
Hot Categories
Chemicals
Batteries