Senior Electrical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 13 years
Relocation: Yes - Internationally
Career Objective
Career Objectives: My career objective is to acquire a challenging position in the Electrical Power field. My key strengths are my ability as a team worker and my technological background coupled with my experiences in Electrical Power Engineering.
Professional Experience
1. DG KHAN CEMENT COMPANY-PAKISTAN: August 1993 to 20-05-1994 was the start of my professional career.
2. KARACHI NUCLEAR POWER PLANT- PAKISTAN: 28-05-1994 to30-09-1995 was the most sophisticated On-Job-Training I had acquired.
3. WATER AND POWER DEVELOPMENT AUTHORITY –PAKISTAN: During this phase (05-10-1995 to 24-01-2003) of my association with WAPDA, I had acquired profound knowledge of Maintenance/Fault tracing/Trouble shooting/Attending Breakdowns at large number of Grid stations and transmission lines including 33/66/132/220 kV systems.
4. SAUDI ELECTRIC COMPANY (SEC-ER) JUBAIL- SAUDI ARABIA: During my association with SEC (26-1-2003 to 30-3-2004), I supervise/coordinate the construction of new Sub Station, Transmission Lines, up-gradation/modification of existing system including Review of Base design, Detail Design, As Built Drawings and providing comments on design of all substation equipment. My responsibilities also include inspection of material and construction, erection of electrical equipment supervising the testing/commissioning activities etc.
5. WATER AND POWER DEVELOPMENT AUTHORITY –PAKISTAN : During this phase (3-04-2004 to 26-11-2005) of my professional life, I got the experience of Construction, Installation, Inspection, Testing and Commissioning of HV/MV equipment at 220/132/66 KV Sub Stations including power transformers, HV circuit breakers, CTs, VTs, all type of relays and various protection schemes. I also continue the experience for review of drawings, schemes and get some experience for relay setting calculations. The inspection experience of all type of Sub Station equipment was also enhanced.
6. SAUDI ELECTRICITY CO. /SAUDCONSULT Eng. Services-SAUDI ARABIA: Presently (28-11-2005 to till now), working in Saudi Electricity Co-Jeddah-Saudi Arabia as Site Manager/Senior Engineer and my Projects/Site Supervision is related to SEC-WRB (Jeddah) works for Sub Stations and Transmission Lines. It includes inspection of installation activities, coordinating/witnessing the testing & Commission activities, coordination between Civil, Electrical, Mechanical works at S/S, monitoring safety and quality, coordinating meetings, issuing site instruction to contractor etc.
Eductation
B.Sc Electrical Engineering: From University of Engineering & Technology, Lahore - Pakistan
M.Sc Nuclear Power Engineering: From KANUPP (Karachi Nuclear Power Plant) Institute of Nuclear Power Engineering: Completed three (3) semesters out of four (4).
Certification
§ I have experience in using Microsoft platforms and applications (Operating Systems: MS DOS, Windows 95/97/98/2000/XP. Office Automation: MS Word/Excel/Power Point/Front Page).
§ I have learnt the following programming languages: Fortran-77, Assembly Language for 8085 INTEL Processor, JAVA.
Additional Information
a) Inspection of S/S material while manufacturing; arrived at site etc.
b) Making progress reports.
c) Check the work as per specification, approved drawings and standards.
d) Coordinating the various activities for Civil, & ElectroMechanical
SUB STATIONS
a) Pre-commissioning and commissioning testing of new substation equipment like power transformers, HV Circuit breakers, HV isolators, C.T, P.T, battery chargers, different type of relays, etc.
b) Complete testing of GIS including High voltage, Contact resistance, Time testing, SF6 Leakage, etc.
c) T.T.R test, C&DF(Tan Delta) tests of winding and H.T bushings, winding resistance test, Dielectric strength of Oil, DGA analysis of oil
d) AC Hi Voltage, Impedance, Capacitance, Jacket, Sheath testing of HV/MV power cables.
e) Testing of current- and voltage transformers. Polarity test, Ratio test, Knee Point test, insulation resistance test, Megger etc.
f) Primary Injection and meggering of various equipment
g) HV/MV Circuit Breakers Time, Contact resistance, Purity and Dew point testing of (SF6) CBs.
TRANSMISSION LINES
a) Survey and route selection of Transmission Line.
b) Foundation/Stub fixing for towers.
c) Tower assembling, erection and tightening.
d) Insulator hanging at towers.
e) Pay out pilot wire and conductor pulling.
f) Dead ending, mid span joints and tower jumpering.
g) Sagging Spanning and clipping of the conductor.
h) OPGW pulling, splicing and sagging.
i) Testing of Transmission lines.
Hot Categories
Chemicals
Batteries