Project Manager
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 13 years
Relocation: Yes - Domestically
Career Objective
Project Manager
Professional Experience
Over hall of 5th Boiler (Process furnace Body)
& Fabrication of 6th Boiler (Steel Structure)
Client : Esfahan refinery
Main Contractor: AzarAB Arak
Urea Ammonia Warehouse (2 saloon) St. Structure(Prj Mang.)
Client : Assaluyeh Urea Ammonia Plant(Petro Pars L.–PPL)
Main Contractor: PIDEK (Shiraz)
Preheat Furnaces for 4th Aromatic Plant (Consultant of Prj Mang.)
Client : Assaluyeh 4th Aromatic Plant(Petro Pars L.–PPL)
Main Contractor: Furnace Eng. Inc. (FEI Japan)
Demin & High Pressure Tank for Shariati Power Plant(Mashhad)
Client : Mapna Co.
Position: Project Manager
Blast Furnace for Esfahan Steel Complex (Consultant of Prj Mang.)
Client : Esfahan Steel Complex(ESCo.)
Main Contractor: Ghaem Reza Co.
Project Manager of steel structure Phase 6,7,8 South Pars Dev.
Client : Petro Pars L.–PPL
Main Contractor: TIJD Consortium.
Eductation
Education:
B. S. in solid mechanical engineering,
From Esfahan university of technology
Project: tratrix deep drawing die Design
Certification
Training:
Turbo Pascal programming
AutoCAD 3D, license of welding inspecting from Iran society of welding
Employment
Company: Esfahan die making
Date: sep. 1996 – marc. 1997
Position: Designer
Job desc.: Designing of piercing die especial in progressive
Additional Information
Company: Kavian Sepahan
Date: marc. 1997 – July. 1998
Position: board of director
Job desc.: Designing and making of piercing die and plastic molding
Company: Setak Sanat
Date: July. 1998 – Nov. 1999
Position: Factory manager
Job desc.: Managing the Workshop
Projects : a) Steel structure making for boiler of Esfahan refinery
b) Esfahan – Yazd – 60” pipeline project.
Company: Milad manufacturing engineering co.
Date: Nov. 1999 – Dec. 2000
Position: Inspector of steel structure and steel making equipment.
Date: Dec. 2000 until Jan. 2004
Position: Sub contractors and inspection manager
Projects : Described as attachment.
Company: Espadana Dynamic Industries
Date: Jan.2004 – April 2004
Position: Managing director
Job desc.: Fabrication & Erection of Building Steel Structure.
Projects : 1 Building 6 Floor –Qty = about 1800 tons
Regal Petrochemical Co. ( Equipment Steel Structure)
Company: PARS International Development Engineering Co.
Date: April 2004 – Jan 2005
Position: Project Manager
Job desc.: South PARS Gas Field Development –Phases 6,7 & 8.
Projects : Pipe Racks Steel Structure & shelter
Company: Hasht Behesht Engineering Construction Services
Date: Jan.2005 - now
Position: General Manager
Job desc.: Fabrication & Erection of Building Steel Structure.
Projects : 4 Building 6 Floor –Qty = about 700 tons
Yazd Steel Making ( Erection of Stack & Hot Air Pipe Line)
Hot Categories