petroleum engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 18 years
Relocation: Yes - Internationally
Career Objective
To have a wide spectrum of working experiences in various functions of Oil & Gas business activity
Professional Experience
keywords: Production Engineering. 17 Years Experience. Bachelor of Engineering. Oil India Limited. Artificial Lift. Coiled Tubing Unit. Nitrogen Pumping Unit. Project Management and Engineering skills in Oil & Gas Pipe lines. Pipe Line Operation & Maintenance. Nodal Analysis. Sand Control. Contract Mangement. Production Planning. Slick Line/Hoist Applications. Well Completion. Oil & Gas Processing. Budget. SAP. Safety. Formation Water Management.
Eductation
bachelor of engineering(b.e)
Certification
Training
TECHNICAL
2005: “Schools on SRP artificial lift system” by Weatherford at Duliajan, OIL
2002: “Gas Lift school” by Ken Hilse of Weatherford at Duliajan- India
2003: “ A course on Petroleum Engineering”- By Prof BP Pandey from ISM conducted at Duliajan
1995: “Workshop on QC Circle” conducted by QC Forum of India.
1989: “Well Productivity Workshop” conducted by IHRDC at Duliajan – India.
INDUSTRY REQUIRED
1988: Basic Safety Training courses
SOFTWARE
2004: Training on MS outlooks, MS Access, AutoCAD
1990: Computer Application Program
1999: Certificate In Computing from IGNOU
OTHERS
ASNT LEVEL-II CERTIFICATION IN 2000.
Additional Information
Employed in Oil India Limited, India (A State owned Oil & Gas Company, India) since 1989.
Deputy Chief Engineer
Responsible for Stimulation & Service of Oil/Gas wells with Coiled tubing (1.25” X 0.087” WT) & Nitrogen applications. Job involves the complete package of designing stimulation/service treatment including execution in the field, operation risk analysis with post job evaluation.
Stimulation involves unloading/backflow of oil & gas wells (depth ~ 3500m) and chemical treatment of wells including matrix acidisation. Service jobs include fill clean out by jetting/ dynadrilling, de waxing, fish recovery etc.
Involved in formulation of work over programs for remedial/stimulation and trouble shooting/diagnosis of wells. Experienced in installation of Velocity String in wells with marginal FBHP.
Having very good experiences of Work-over, Well intervention (slick-line, E-line, Coiled tubing, PLT, etc) programs formulation and supervising the operations.
Extensive experience with rod design, installation & selection of Sucker Rod Pumps. Exposure to design/simulation platforms like API procedures, and Qrod for vertical/deviated wells. Familiar with optimization including trouble shooting with dynagraphing of Rod Pump wells.
Experience in Production Planning. Responsibilities included preparation of production costs feasibility studies and production forecasting.
Hot Categories
Chemicals
Batteries