Project engineer ,electrical /automation
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
To become an active member of the dynamic team of the organization, Accept challenges, contribute to organizational goals and further to improve my professional skills.
Professional Experience
Presently doing job in ABB (Pvt ) Ltd. Lahore branch as a project engineer in DCS control system. I have worked on ABB controller AC800F , developed HMI’s and logic for a project Rahmat Nazeer Reyan , using freelance 2000 V7.1 software ,other jobs accomplished are control panel design for DCS equipment ,supervising its complete build up by the vendor, FAT before delivery to customer, installation at site, establishing communication setup , field instruments termination and loop testing.
I have successfully completed the hardware replacement from S400 to S800 I/Os for the DCS upgradation project from ABB’s Masterpiece to ABB’s Industrial IT 800A system at Askari cement Wah. My job comprised the design of new set up ,their replacement ,powering up ,setting communication and loop testing of I/O channels, insuring ABB standard and quality work and timely completion during shut down period. On software side though I was not involved in application development,but I have given training of the system comprising of the following subjects ,Introduction to PDA tool,I/O allocation ,configuration of the basic object,configuration of the group objects,800A system architecture,Hardware AC800M,User interface plant explorer,Monitering and testing application,Configuration with control module,Creation of process graphics,Alarms and events,System administration,Online system testing,Application downloading,Defining of start warning,and Developing of starting/stopping sequence of the groups.
Project Engineering and design of Electrical and Instrumentation package of 80TPH water-tube boiler for Chashma Sugar Mills ,supplied by HMC. This boiler is dual fuel, incorporating oil and baggase. My major contribution was Configuration of the Single Loop Controllers, Universal Indicators and Universal recorders, 3-Element Drum level control,Automatic Combustion control,Furnace draft pressure,Baggase Feeders speed control control. Design and testing of Motor control center for FD fan, Feed water pump, ID fan, Ash conveyor and Picker roller motors,Design of Soot Blower Control Panel and Programming of ABB “A Series Server PLC” for Soot blower logic control sequence.
Apart from this I have good knowledge of drawings ,like Panel drawings,Power distribution drawings,I/O cards wiring daigrams,P&IDs and loop drawings.
Eductation
Bsc electrical engineering
Certification
DCS control system ABB
Hot Categories
Chemicals
Batteries