Muneeb Ahmed Ansari
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
To pursue career in an industry related to design, preventive maintenance, trouble shooting, installation, commissioning and testing of electrical equipment and system.
Professional Experience
DESCON Engineering Limited, Manufacturing Business Area
(From April-2005 till Aug 2006)
Worked as Electrical and Instrumentation Engineer in Project Management Department.
PROJECTS:
1 Worked as E&I Execution Engineer at the Installation & Commissioning of 3 Nos. Heat Recovery Steam Generators (HRSG) 1.2 TPH, Steam Pressure 7 Barg, Steam temperature 170 o C at Lucky Cement Power Generation Plant Pezu, Lakki Murvet N.W.F.P
2 Worked as E&I Execution Engineer at the Installation & Commissioning of 70 TPH Water Tube Single Drum Boiler, Steam Pressure 600 Psi, Steam Temperature 460 o C at National Refinery Limited Korangi Karachi.
DESCON Engineering Limited (From November-2004 to March-2005)
Worked as QA/QC Engineer (E&I) at Rehmat Gas field development project, District Ghotki, Sindh.
Olayan Descon Industrial Company Limited (From November 2003 to October 2004)
Worked as QA/QC Engineer (Electrical) at Saudi Methanol Project at AL-Jubail, K.S.A
DESCON Engineering Limited ( From February 2003 to August 2003 )
Worked as Electrical Engineer (Execution) at SAWAN Gas Field Development Project.
Installation of 600-mm, 300-mm cable ladder, for primary power and control cables and perforated cable tray for lighting and secondary instrument cables according to project drawings and available routes.
Installation of 40 W pole mounted and bracket mounted normal and emergency lighting fixtures in utility area, process area, tanks, platforms, 250W and 400W floodlights and road lights with installation of cable tray, cable termination.
ADAMS Motor Company (From January 2002 to January 2003)
Worked as Electrical Design Engineer.
Designing and preparations of Electrical Drawings / Single Line Diagram
Load calculations for the installation of gas generators for the new plant.
Prepare tenders for gas generators, cables, and electrical panels.
Pakistan Refinery Limited (From October 1999 till October 2001).
Worked as Graduate Trainee Engineer (GTE) in Electrical section of Maintenance department.
The responsibilities in the department include:
Preventive maintenance and emergency repairs of electrical equipment.
Maintain the electrical system and associated equipment for example: -
Flameproof squirrel cage induction motors up to 3.3 kV ranging from 1 HP to 750 HP.
MICC cable for wiring/lighting in hazardous areas.
Eductation
PROFESSIONAL QUALIFICATION
1998 B.E Electrical
N.E.D University of Engineering & Technology Karachi.
1st Division.
ACADEMIC QUALIFICATION
1992 Inter science
From Adamjee Govt. Science College,
Board of intermediate education, Karachi.
1990 Matriculation from Karachi Board.
Additional Information
SAP: Implemented plant maintenance module of SAP
(Deployed by SEIMENS) in Electrical Department,
Pakistan Refinery Limited. Also prepared Equipment Master,
Assembly and Sub-assembly Master and Material master data for
SAP R/3 Module.
GANTRY: Worked on New Sub Station installation / erection of High Furnace Oil (HFO) back loading facility (Gantry).
ELECTRICAL ENGINEERING FIELD PROJECT
Network operating system based on serial communication.
ADDITIONAL SKILLS
I am fully at ease with Windows package.
MS Office (Word, Excel, etc).
Languages: Urdu and English.
AFFILIATION
Pakistan Engineering Council (PEC) NO: ELECT/15567
Hot Categories
Chemicals
Batteries