Egypt Zones accountACCOUNT

commissioning engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 16 years
Relocation: Yes - Internationally

Industry Experience
10 years Chemical Engineer
5 years Plant Manager

Career Objective

to engage in commissioning of process plant, debottlenecking, trouble shooting

Professional Experience

experience in commissioning of polyester plant, simatic 135 u PLC unit, commissioing of steam ejectors, modification in vacuum columns, reduction in batch time of polymerisation and esterification reation time.

project work of HDPE plant (mitsui technology), pre commissioining and commissioing of HIGH DENSITY POLETHYLENE PLANT, trouble shooting, debottlenecking to increase the plant capacity to 146%.

PAPER PUBLISHED IN INTERNATIONAL MAGAZINE POWDERBULK.COM
TOPIC CLOSED LOOP PNUEMATIC CONVEYING SYSTEM.

NATURAL SKILLS IN COMMISSIOING OF PROCESS PLANTS.

Eductation

CLEARED THE JOINT ENTRANCE EXAMS OF PREMIUM INSTITUTE OF INDIA ( INDIAN INSTITUTE OF TECHNOLOGY)
BACHELOR OF ENGINEERING CHEMICAL ENGINEERING FROM NATIONAL INSTITUTE OF TECHNOLOGY.

Certification

B. TECH NATIONAL INSTITUTE OF TECHNOLOGY ( INDIA)
LEAD AUDITOR COURSE FROM INTEC UK
DIPLOMA IN HUMAN RESOURCE MANAGEMENT.

Additional Information

BASIC SKILLS IN COMMISSIOING OF PROCESS PLANT.
JOB NATURE

HDPE PLANT ( 10 YEARS 10 months)
(19th aug 1995-1st june 2006)
• Project Work of HDPE plant.
• HAZOP STUDY
• PRE COMMISSIONING & COMMISSIONING OF HDPE PLANT
• WORKED AS SHIFT INCHARGE HDPE PLANT
• TRAINING OF OPERATORS AND ENGINEERS
• DEBOTTLENECKING ( RAISED CAPACITY UPTO 146%)
• PREPARATION OF STANDARD OPERATING PROCEDURES, LOG BOOK, LOG SHEETS
• SIMULATION / INTERLOCK CHECKING
• COMMISSIONING OF FLAKER ( WAX PRODUCED DURING HDPE PRODUCTION)
• HANDLED SINTERED POLYMER REACTORS.
• SOLVED PNUEMATIC CONVEYING PROBLEM



POLYESTER PLANT ( 5 years)
( from 27 th sept 1990 to 16 aug 1995)


• COMMISSIONIG OF POLYESTER REACTORS
• COMMISSIONING OF EJECTORS
• COMMISSIONING OF PLC SIMATIC 135 U ( SIEMENS)
• MODIFICATIONS IN VACUUM COLUMNS
• BATCH TIME REDUCTION ( UPTO 60%)
• WORKED AS SHIFT INCHARGE OF POLYESTER PLANT.
• HANDLING SITUATION AFTER FIRE, LOGIC IMPLEMENTATION

LPG PLANT
(since 1st june 2006)
GAS PROCESSING
LPG PRODUCTION
CATALYTIC CRACKING OF NATURAL GAS LIQUID
GAS TRANSMISSION
Working as Manager (GPU-OPS)

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.