Project & Facilities Engineer, involved in oil and gas Production Plants Projects
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
Develop of my experience
Professional Experience
PLUSPETROL NORTE – TECNA S.A. Block 1AB Per?
Chief Facilities Engineer in oil-field, Jungle of Per?
January 2004 to date.
Development of Engineering Projects
• Designed of Separation Plant for 60,000 BPD Gas-Water-Oil.
• Design of fire protective systems in 7 Plants.
• Modified of separation process in accordance to new % of water produced.
• Design of waste-water treatment Plant (100 Mbpd) for subsurface re-inyection.
• Calculate & Design of atmosferic tanks according to API 650.
• Calculate & design of pipeline for gas, oil and water. According to
• Design of 2 MMSCFM Gas treatment Plant
Mantenimiento y Construcciones Pari?as S.A. Refineries of Per?
Technical Manager Jul 01 to Dec 03
• Designed of storage tanks and pipelines in Talara’s Refinery.
• Responsible of Annual Maintenance of Conchan Refinery: Tanks and pipelines construction, heat insulation systems and vapor systems installation.
• Development and execution of Interconnecctions for Inverse Osmosis in Talara’s Refinery.
FIEM INGENIEROS S.A. In Charge of Two Projects: Per?.
Technical Manager Nov 99-Jun 01
• Responsible Construction of Plant Crude oil Treatment Carrizo in Talara for Perez Companc S.A. (Now Petrobras) for 30,000 BPD.
• Responsible of Hydro-cyclone Plant construction for 8,000 BPD salt water treatment for refrigeration Talara’s Refinery process.
FABRICANTES Y CONSTRATISTAS S.A. Per?
Operati?ns Manager Jan 94-Oct 99
• Development of Projects for PETROPERU Talara’s Refinery, Mechanical and electrical Drawings and dossier of new installations and enlargements.
• Execution of different services such as, pipelines, Tanks repair, Construction of fire protective systems, pumps installations.
• Substations enlargement, wire lines, motor and MCC installations.
• Installation of new Process Control of flow.
ARSENIO SALAS S.A. Per?
Chief Engineer 1992 to 1993.
In charge of tanks Construction, skid, and pumps installation.
Supervision of woks in machine tool; lathe, plane, and milling machine.
FORTIPLAST S.A. Per?
Designing Engineer 1990 to 1992
Automation of injection machines with hydraulic control.
FLUIDTEK SRL. Per?
Designing Engineer 1987 to 1989
Design and calculate of hydraulic and Pneumatic Projects for process automation.
Eductation
EDUCATION
Pontificia Universidad Cat?lica del Per? Lima, Per?
Mechanical Engineer, (College Register 64489).
ASME Member. No. 8619736
Thesis: Designed Plant of crude-oil treatment.
Certification
Mechanical Engineer, (College Register 64489).
ASME Member. No. 8619736
Hot Categories
Chemicals
Batteries