senior instrument engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 16 years
Relocation: Yes - Internationally
Career Objective
senior instrument engineer in project
Professional Experience
WORK EXPERIENCE :
1990- To Date Sonatrach ENC (Engineering And Construction)
8 Chemin du Reservoir, Hydra Algiers ,Algeria.
2004-2006 Project Manager « Revamping of gas treatement unit at Hassi Rmel »
Contrator JGC (Japan Gas Corporation)-10 MU$D-18 Months.
(DCS FOXBORO I/A series-ESD Triconex).
2001-2003 Consultant at Brown&Root condor (Engineering Company Algeria).
-Detail engineering for dehydration unit at BRN project.
-Detail engineering for dehydration unit and startup UDA project
-Proposals for projects.
-Member team for differents HAZOP study’s.
1998-1999 Responsible of Instrumentation During Construction Phase of TFT
Project.
1996-1998 Responsible of Instrumentation During Phase Detail Engineering
Project TFT At Brown&Root Office Alhambra California.
(DCS infi90 -Bailey - Cleveland)
1994-1996 Miltary service.
1993-1994 Responsible Of Instrumentation During Phase Detail Engineering
Project BRN At Snamprogetti Office Milan Italy.
1992-1993 -Supervisor of Construction,commissioning And Startup Project
Guellala LPG plant with Mistubishi.
-Participation In Instrumentation Design Basis for BRN Project
at AGIP Office Milan Italy.
1991-1992 Supervisor of Construction Project Ait Kheir Compressor Station
With Nuovo Pignone.
1990-1990 Training at Hassi R’mel
Maintenance And Exploitation of Gas Plant Module4,compressor
Station .
Training At Rhoud Nouss
Scada and Telemetrie System.
Eductation
engineer from univerty of algiers equivalent to BSC degree
Additional Information
QUALIFICATIONS :
Plant instrumentation :
Instrument Design Basis
Basis For Selection Of Plant Instruments
Control Philosophy
Sizing Of Safety Valves,Control Valves,Orifice Plates etc ..
Criteria For Location Of Instruments On Piping,Vessel,Tanks etc..
Process Control :
Control,Shutdown,and Sequential Control System Definition
Scada &Telemetrie Definition ,Sizing And Selection
Development Of Control Strategies
DCS :
Development of System Architecture
Preparation Of database For Control System
Development Of Configuration Guidelines
Graphics,Group,Alarm Displays Definition And Generation
System Checkout At the Factory.
Plant Startup Procedure :
Calibration Of Field Instruments
Field Checking Procedures For Impulse Line, Air Lines,Cables etc
Loop checking Procedures
Safety Valve Testing .
Sequence Checking,Timer,Alarm And Set Point Adjustements.
Hot Categories
Chemicals
Batteries