ROLANDO S. GARCIA
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
To become a member of a World Class AND INTERNATIONAL cOMPANY
Professional Experience
2001- to Present National Power Corporation Philippines
Principal Engineer- Operation Division; Angat Hydroelectric Power Plant.
„X Responsible for the operation of AC generators, switchyard equipment and auxiliaries to effect efficient and reliable production of electric power.
„X Analyses and evaluates records, indicated and integrated data for optimum power plant operation.
„X Supervises and/or performs maintenance works assigned to Operation Division such as Preventive and Corrective works and measures.
„X Prepares and submits pertinent operation reports to higher authorities.
„X Implements Corporate and Plant Policies, Enercon Guidelines and Safety Procedures.
1997-2001 National Power Corporation Philippines
Principal Engineer- Planning and Scheduling Group; Sucat Thermal Power Plant.
„X Implements an effective corrective maintenance program: preliminary on-site evaluation/validation of reports trouble/ work requested through problem analysis, recommendation of appropriate solution, and coordination to work centers.
„X Implements an effective preventive maintenance program: establish preventive maintenance requirement of plant equipment; develop appropriate schedule, coordinate implementation with work centers, review and analyze maintenance works findings, formulate recommendations to prevent equipment failure.
„X Implements an effective outage program (weekend, preventive, annual/major overhauling); prepare, collate, analyze and prioritize shutdown/outage activities to arrive at an integrated program; identification/preparation of requirements and coordination with work centers.
„X Coordinates/monitors on-going activities whether corrective, preventive or outage activities and project type activities to facilitate timely completion, perform necessary inspection on equipment during shutdown and overhauling.
1992-1997 National Power Corporation Philippines
Equipment Operator- Operation Division (Boiler Section)- Sucat Thermal Power Plant.
„X Responsible for tending and monitoring steam generators (DRUM TYPE and ONCE THROUGH TYPE); and its auxiliary equipment for safe, reliable and continuous operation.
„X Involves in preparing boiler auxiliary equipment for start-up and shutdown.
„X Participates in preparing the equipment for testing, sets boiler for reliability tests including its accessory parts.
Eductation
2003-Present University of Regina Carmeli Philippines
„X Masters in Business Administration.
1982-1988 Namei Polytechnic Institute Philippines
▪ Bachelor of Science in Mechanical Engineer
Certification
Licensed Mechanical Engineer, certified by The Philippine Regulation Commission in 1988.
Additional Information
1989?V1992 CAROUSEL FIRE SYSTEM INC. Philippines
Project Engineer
„X Implements supervision and control over the activities and work performance of personnel with regards to the installation of Automatic Fire Sprinkler System (A.F.S.S)
„X Review and check Fire Protection plans of all on going projects. Performs accurate planning and decision making with regards to any revisions of scope of works and make recommendations for its implementation.
„X Represent the company during jobsite management and technical meetings.
„X Acts as a Technical Sustaining Employee of the company for the Mechanical Engineering Jobs.
Hot Categories
Chemicals
Batteries