Planning Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
To obtain a Senior Project Management position that makes a major contribution to the Operations of an Oil & Gas and Petrochemical support group in an International environment.
Professional Experience
Cristal Expansion Project CEP2
CRISTAL PIGMENT PLANT
The National Titanium Dioxide Co.,
Yanbu, Saudi Arabia
Planning Engineer.
Nov. 2005 - Till Date
Nasser S Al Hajri Corp., KSA
(ISO9001: 2000)
• Develop an overall Master Construction Schedule, detailed and resource
loaded Schedules.
• Develop a resource loading spreadsheet for workload vs. manpower analysis.
• Analyse performance indicators.
• Support the Site Manager in risk mitigation.
• Up-date master schedule monthly and identify deviations & potential risks.
• Develop and maintain overall Project Cost Report, cost to date.
• Cost/Schedule Variances and cash flow projections.
• Maintain Project Trend & Contract Change Notice procedure.
• Working closely with Field Engineers to ensure the work is properly
planned & accurate progress quantities are established and verified for accurate progress billing along with preparation of check estimates for scope changes or claims.
• Schedule for Plant shut down job with resources.
AIR SEPARATION UNIT PROJECT
(ASU-II),
SABIC GAS PLANT,
Yanbu, Saudi Arabia
Construction Planner
Nov. 2004- Nov. 2005
Nasser S Al Hajri Corp.,KSA
• Developed on-site schedules for a Piping, Equipment, Civil, Electrical
& Instrumentation works.
• Expedited the receipt of material in accordance with construction
requirements.
• Co-ordinate field issues and problem resolution with the appropriate areas
(engineering, manufacturing).
• Expedited project requirements and identify deviations to the Project
Manager for resolution.
• Site representative at the Senior Management Project Review Meetings.
• Responsible for the requisitioning and delivery of field materials.
• Responsible for all the field construction & Shop Fabrication activities in the
area with specific crafts.
PETROLEUM PROJECTS
BHARAT PETROLEUM (BP),
Planning Engineer.
Dec. 2003- Nov. 2004
Devi Constructions India Pvt. Ltd.,
• Cost Estimating, Budgeting, Measurements and invoice.
• Review cost data source documents (PO's, Subcontracts) and similar
documents for assignments of correct cost codes.
Thermal Power Projects
Bharat Heavy Electricals Ltd.,
Planning Engineer
Sep. 2002- Dec. 2003
Tiruchy Engg. & Consultants.
• Monitoring day-to-day activities, manpower & equipment and keeping the
Project Manager updated on these issues.
Eductation
Bachelor of Engineering (B.E Mechanical Engineering), 2002
from Periyar University, India.
Diploma In Mechanical Engineering,
from State Board of Technical Education, Tamil Nadu, India.
Hot Categories
Chemicals
Batteries