electrical projects engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
Benefit From My Skills.
Improve Myself.
Gain Knowledge and Experience.
Earn Money.
Looking for the best.
Professional Experience
*job description: Electrical site engineer at the oil field in the projects department in a Petroleum Company.
*aware by: -Cathodic protection system.
-Distribution and power transformers.
-Power electrical cables calculations.
(Voltage drop-cables sizing).
-Power cables tests (insulation and resistance).
-Load study calculations.
-Substations consist of switchgear system with a synchronization standby source (generator).
-Earthing systems.
-Motor starting methods.
-Preventive maintenance for electrical generators.
-Drawing SLD for electrical networks using AutoCAD.
- Prepare history cards for electrical equipments.
-Tenders technical evaluation procedures.
Eductation
University: Higher Technological Institute at 10th of Ramadan City (H.T.I.)
Department: Electrical Engineering
B.Sc.: Electrical Engineering, Augast 2004
Graduation Project: Production Line Application (Control System)
Project Grade: Excellent
Year of Graduation: 2004
Certification
*Power protection system course in Enppi.
*Programming logic controller (PLC) course in Enppi.
*Induction Motors (selection-operation-maintenance) in Petromaint.
*Hazards area classification course in Alexandria University.
*Communication and job hazard analysis course in Egyptian Training Center (ETC).
Additional Information
*jobs had been attended:
-Commissioning and start-up of (liestritz) screw pumps with (weg) motors equipped with a variable speed drive (VSD) at ESHPETCO site.
- Installation, commissioning and start-up of switchgear system consist of several phases of voltage (low-medium) and synchronizing with CATERPILLAR GENSET achieved by ABB and Schneider companies at ESHPETCO site.
-Commissioning and start-up of ESHPETCO pipeline and water injection tank cathodic protection system.
-Commissioning and start-up of a desalination unit with a reverse osmosis technique controlled by a PLC system.
-Assembling, commissioning and start-up of ESP oil artificial lift system consists of either VSD or SB technique.
-Commissioning and start-up of a fiscal meter skid as a fluid measuring system supplied and commissioned by EMERSON Daniel measurement and control.
(Measurement and Calibration).
-Design, construction and installation buildings power distribution (lighting- normal sockets-power sockets-air conditions-three phase) with calculations and drawings for five buildings.
Hot Categories
Chemicals
Batteries