Career Objective
Talented and accomplished electrical engineering professional with extensive background in Power Plant and Oil & Gas industry. Proven ability to carry out aspects of engineering and project management.
Professional Experience
Total E&P Indonesie, Balikpapan Indonesia, October 2004 now
Electrical Construction Supervisor
Supervising various electrical construction projects in field area of Total Indonesie, including Handil, CPA (Central Processing Area), CPU (Central Processing Unit), NPU (North Processing Unit), BSP (Bekapai, Senipah, Peciko). Working with rotation schedule 2 weeks on duty 2 weeks off duty. Some projects executed are :
Replacement of obsolete Teledyne Thermal Electric Generator (ThEG) with new Global ThEG.
Installation of Water Reinjection Pump in CPU Process Area.
Relocation of Power Supply of Air Compressor to Emergency Busbar.
River Crossing Cable Replacement between Handil-CPA.
Installation of Electrical Devices for various building, including office, warehouse, restaurant, laundry, and so on.
Installation of New Water Treatment Plant at Handil.
Installation of Impressed Current Cathodic Protection at TRF Badak.
Installation of new Flash Light for Manifold Wellhead Platform (MWP) at Peciko Sea. The flash light is visual alarm used in noisy area.
Installation of new Fence Lighting at Senipah Process Area.
High voltage cable replacement for crude oil transfer pump at TPA Senipah.
Installation of new Telecom Tower at Bekapai Process Platform.
Senipah Tank Lightning Protection.
The electricity in Total Group will be inspected by third party Cete Apave from France. This inspection held every year to make sure that all electricity in Total Area is safe as per Total standard.
PT Rekadaya Elektrika, Jakarta Indonesia, March 2004 October 2004
Electrical Engineer
Making electrical design and calculation for various Power Plant and Transmission and Distribution Project. Some project handled are:
Power System Analyzing using ETAP PowerStation for Losses Reduction Program in PLN (Indonesian State Electricity Company) distribution Jakarta and Tangerang.
Making technical requisition for portal and compact distribution substation.
Making feasibility study for Mataloko Geothermal Power Plant. This study will calculate the future load and power balance after operation of new Power Plant.
Making technical bid evaluation for Batam Coal Fired Power Plant.
Eductation
B.Eng in Electrical Engineering (Electric Power Engineering), Bandung Institute of Technology, March 2004. Graduated with cum laude predicate with GPA 3.45 of 4.00
Certification
2006 School of Electrical Engineering and Informatics, ITB Lightning Protection and Its Application in Indonesia
2006 Cete Apave (under Total Indonesie) Low Voltage Installation
2006 Cete Apave (under Total Indonesie) Electrical Installation in Hazardous Area
2006 Total E&P Indonesie Cause Tree Analysis (CTA)
2005 Total E&P Indonesie Atmosphere Explosibles (ATEX)
2005 Alkon Scaffolding Inspector and Supervisor
2005 Cete Apave (under Total Indonesie) Electrical Ability Permit
2005 Total E&P Indonesie Fire Fighting Level 1
2005 Total E&P Indonesie Safety Awareness Training
Additional Information
Award
ITB Fair Scientific Paper Competition (runner up), 2004, with title Sustainable Development as An Alternative Solution to Overcome Energy Crisis in Indonesia.
Computer skills
MS Windows, Linux, MS Office, Visio, Adobe Photoshop, CorelDRAW
Electrical Engineering Software : ETAP PowerStation, MATLAB SimPowerSystem, PSIM, URPC from GE Multilin