electrical engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 12 years
Relocation: Yes - Internationally
Career Objective
oil and gas
Professional Experience
I am Electrical Engineer and I have 12 Years Experience with the Oil and Gas Companies in Syrian Arab Republic .as Electrical Engineer in the following Chronicle:
1- from 1995 to 1998 Syrian Petroleum Company which is the mother PC in Syria as Electrical Maintenance Engineer for the HV &LV Equipments and Overhead Lines.
2- from 1999 to 2000 CONOCO Gas Company as Electrical Supervisor Engineer for
The CSDGL Plant Construction which is The largest Gas Plant in Syria and One Year for Operation as Electrical Maintenance Engineer .
3-from 2001 to Date Alfurat Petroleum Company (a Joint Venture between SPC and Shell International Company) as Electrical Maintenance Engineer in Omar Power Plant.
The Power Plant consists of five Gas Turbine Generators Frame6 Synchronized with 14 Solars Generators. the Plant include HV motors , LV motors , UPS, Cathodic Protection,step up and step down Transformers , HV&LV Cables Battery and Battery
Chargers ,four Substations, HV &LV Switchgears, and 66kv & 20kv Overhead lines, Lightning Protection ,Earthing System, and Protection Relays and BSDG .
I am Senior Authorized Electrical Person according to AFPC Safety Rules .
Eductation
I am Electrical Engineer and I have 12 Years Experience with the Oil and Gas Companies in Syrian Arab Republic .as Electrical Engineer in the following Chronicle:
1- from 1995 to 1998 Syrian Petroleum Company which is the mother PC in Syria as Electrical Maintenance Engineer for the HV &LV Equipments and Overhead Lines.
2- from 1999 to 2000 CONOCO Gas Company as Electrical Supervisor Engineer for
The CSDGL Plant Construction which is The largest Gas Plant in Syria and One Year for Operation as Electrical Maintenance Engineer .
3-from 2001 to Date Alfurat Petroleum Company (a Joint Venture between SPC and Shell International Company) as Electrical Maintenance Engineer in Omar Power Plant.
The Power Plant consists of five Gas Turbine Generators Frame6 Synchronized with 14 Solars Generators. the Plant include HV motors , LV motors , UPS, Cathodic Protection,step up and step down Transformers , HV&LV Cables Battery and Battery
Hot Categories
Chemicals
Batteries