COMMISSIONING ENGINEER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 5 years
Relocation: No
Career Objective
ACCHIVE
Professional Experience
1) Worked as Process operator in Bharat Petroleum Corp.Ltd.(Refinery).Mumbai.For
Period of Three years.
2) Worked as Commissioning Engineer for Larsen & Toubro Ltd. in ‘Hydrogen Generation Unit’
(HGU) In Bharat Petroleum Corporation Limited (R). Chembur, MUMBAI.
Capacity -: 45,000 MTPA.
3) Worked as Commissioning Engineer for TOYO ENG.INDIA LTD. in ‘Lube Oil Base Stock’
(LOBS) project in Bharat Petroleum Corporation Limited (R). Chembur, Mumbai.
Capacity -: 180 TMTPA.
4) Worked as Commissioning Engineer for Larsen & Toubro Ltd., in. MOTOR SPIRIT
QUALITY UPGREADATION (MSQ) Project in Mangalore Refinery & Petrochemical Limited.
Mangalore. (A Subsidiary of ONGC). Capacity – 0.7 MMTPA.
5) Now working as Process Operator for Larsen & Toubro Ltd inGASCO Bu-Hasa Facilities
Upgrading Project. Bu Hasa, Abu Dhabi. (UAE).
Eductation
: 1) S.S.C. with 73.73 % in March 1998.
2) H.S.C. with 63.17 % in Feb 2001.
3) B.Sc. appeared. (Third year)
4) Diploma in Petroleum Tech. in April-2006.
Technical Qualification : Completed National Council of Vocational Training
(NCVT) with 75.00 % in 2004
Additional Information
For Lube Oil Base Stock Project.
Made a scheme for handing over mechanically completed plant to process department, for declaration of mechanical completion, operation punch list, line flushing, pressure test, instrument installation, system commissioned, as fallow.
1) Format 1 – Mechanical completion. 2) Format 2 – Operation punch list.
3) Format 3 – Punch list attended. 4) Format 4 – Flushing completed.
5) Format 5 -- Instrument installation. 6) Format 6 – Pressure test completed.
In LOBS plant jobs done are,
1) Made flushing plan.
2) Hydrostest loop diagram mark on P&ID With different colour.
3) Done P&ID checking of piping & equipment.
4) Made punch list for piping & equipment & attended it with help of piping engineer.
5) Check under ground system, clean it & commissioned it.
6) Done vessel inspection & done final box up.
7) Done flushing, cardboard blasting & steam blowing
8) Release lines for insulation & painting.
9) Release spring supports. Checked PMI. Made RTJ flange list.
10) Done INERTIZATION of flare header & other systems.
Worked in Precommissioningg & Commissioning activities in HGU.
Hot Categories
Chemicals
Batteries