Professional Experience


1) Worked as Process operator in Bharat Petroleum Corp.Ltd.(Refinery).Mumbai.For
Period of Three years.

2) Worked as Commissioning Engineer for Larsen & Toubro Ltd. in ‘Hydrogen Generation Unit’
(HGU) In Bharat Petroleum Corporation Limited (R). Chembur, MUMBAI.
Capacity -: 45,000 MTPA.

3) Worked as Commissioning Engineer for TOYO ENG.INDIA LTD. in ‘Lube Oil Base Stock’
(LOBS) project in Bharat Petroleum Corporation Limited (R). Chembur, Mumbai.
Capacity -: 180 TMTPA.

4) Worked as Commissioning Engineer for Larsen & Toubro Ltd., in. MOTOR SPIRIT
QUALITY UPGREADATION (MSQ) Project in Mangalore Refinery & Petrochemical Limited.
Mangalore. (A Subsidiary of ONGC). Capacity – 0.7 MMTPA.


5) Now working as Process Operator for Larsen & Toubro Ltd inGASCO Bu-Hasa Facilities
Upgrading Project. Bu Hasa, Abu Dhabi. (UAE).

Eductation

: 1) S.S.C. with 73.73 % in March 1998.
2) H.S.C. with 63.17 % in Feb 2001.
3) B.Sc. appeared. (Third year)
4) Diploma in Petroleum Tech. in April-2006.

Technical Qualification : Completed National Council of Vocational Training
(NCVT) with 75.00 % in 2004

Additional Information

For Lube Oil Base Stock Project.

Made a scheme for handing over mechanically completed plant to process department, for declaration of mechanical completion, operation punch list, line flushing, pressure test, instrument installation, system commissioned, as fallow.
1) Format 1 – Mechanical completion. 2) Format 2 – Operation punch list.
3) Format 3 – Punch list attended. 4) Format 4 – Flushing completed.
5) Format 5 -- Instrument installation. 6) Format 6 – Pressure test completed.

In LOBS plant jobs done are,
1) Made flushing plan.
2) Hydrostest loop diagram mark on P&ID With different colour.
3) Done P&ID checking of piping & equipment.
4) Made punch list for piping & equipment & attended it with help of piping engineer.
5) Check under ground system, clean it & commissioned it.
6) Done vessel inspection & done final box up.
7) Done flushing, cardboard blasting & steam blowing
8) Release lines for insulation & painting.
9) Release spring supports. Checked PMI. Made RTJ flange list.
10) Done INERTIZATION of flare header & other systems.

Worked in Precommissioningg & Commissioning activities in HGU.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.