Senior engineer, Piping & Plant Design/ H.D.P.E Plant Specialist,PIPING OR PLANT FIELD ENGINEER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
Senior engineer, Piping & Plant Design/ H.D.P.E Plant Specialist
piping or mechanical field engineer
Professional Experience
--Senior team engineer
* Aug-2002 (1381-04-06) Still Now Sazeh Consultant Eng Co.
- - Experiences on several projects on my employer sazeh consultant engineering co. as:
1- Kerman shah (gharb )Petrochemical Co.
2- Jam petrochemical Co.
3- Marun Petrochemical Co.
Kerman shah (Gharb) Petrochemical Co. Kerman shah
1.1-Mechanical /piping PE for Kerman shah (Gharb) H.D.P.E
1.2-Piping /Mechanical Coordinator for construction field
Jam Petrochemical Co. Asalouyeh Free Zone
2.1-coordinator between EP and Supervision/ construction
2.2-Piping Field Engineer & EP engineer on Field
Marun Petrochemical Co. Mahshahr Free Zone
3.1-piping field engineer
Eductation
1993-1998 Bachelor degree in Chemical Engineering, Process, I.U.S.T
Iran University Of Science & Technology
* Tehran Refinery Co. (3 months)
Training was about line up, instruction to p&id & process, Equipment, instrument function, maintenance, Operation and … in Machine Oil Unit
* Oldoz Rubber Industrial Co. (3 months)
Worked on Special Rubber and Polymers that can be resistance on alcohol and acid environment, study on several base materials for our purpose and must select one that, after it studied for additive and other component for reach to our purpose that need to prepare procedure for chemical and physical step till make our special rubber
* PDMS Design Package
* PDMS
Certification
* HYSYS Process Software
Additional Information
Piping field engineer on HDPE Project In Marun Petrochemical Complex, Trying to Solve Any Problem during construction, about Piping/ Support Drawings or Field erection or yard prefab, these problem sometimes came mismatch between PID and Isometric DWG’s, some times problems came from PDMS, Designer fault, some isometric drawings not match with Instrument Hook Up ,some times we had clash with electrical/instrumental cable tray /ladder,then isometric drawing’s must be changed according to PID and process description .
After construction we ready our plant for Pre/Commissioning activities, all vendors checked our piping rout around their package and had several punches that I must revised our isometric dwg’s.During my work on Marun complex had several training, project document instruction, and piping supervision, etc.
After Marun HDPE Complex I transfer all of my experiences to Jam HDPE project that had big problems about piping design,I Helped to supervisions for better handling and now we are ready for Commissioning activities, Now I had big experiences about HDPE Plant, about piping/process design and instrument and several equipments,Now I can recognized several designers fault and Roots of these fault, then in our new HDPE Project Kerman shah(Gharb)HDPE,I focused on Our design office on main building in Tehran and should be checked all piping design. Transfer all my experiences to designers ,I ‘m senior team designer ,helped to piping designer for match all routs by PID,
Hot Categories
Chemicals
Batteries