Senior Electrical engineer - chief electrician - rig electrician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Gain new experience and skill level to build up on my +12 years of experience in Middle East in the Oil Field Industry.
Professional Experience
Presentation of the field experience S.C.R System I.D.M & GE - Ross hill, I.B.S, I.P.E.C System, S.P. System, Draw Work, Load Shearing-, PLC Unit top drive, A/C motor TDS9, TDS3, and TDS4,- CAT Engines include D398, D399, 3512, 3506, 3508, , 3406, 3408 and 3412 - Cato-generators and all dry Transformers from 600 Volt to480, 360, 220, 110 V .Distribution Panels & Networks ,I am capable to maintain most of electronic equipments as project manager. Block Control System, Mud Watch Maintenance Engineer-Maintenance Section, EDC
Receiving MRRs (Maintenance and Repair Reports) from rigs and sending replies to them back.
Contact with rigs superintendents to handle Problems may occur in rigs.
Coordinator - VR 2000, Egyptian Drilling Company (EDC)
This section is responsible for following up the preventive maintenance that took place in rigs, preparing rig data sheet according to EDC standards, issuing work instruction, assigning weekly jobs for each rig, saving jobs history, and maintaining the VR software in all rigs.
The VR (is the abbreviation of Visual Rig Equipment Management System), that is used in EDC for maintenance; designed specially for EDC in Copenhagen VR is an application form that is connected to a database of all maintenance and repair reports (MRRs), jobs history, work instructions, weekly jobs, and many other modules that the application contained.
My responsibilities are represented in installing the VR software in the computers of the rigs and on the computers of superintendents with full administrator privileges, training superintendents, senior mechanics, senior electricians how to use VR, making visits to rigs to maintain the application.
Project Controller New Building Section, EDC
This section is responsible for bringing rigs from the manufacturer (USA, Canada,
etc.) to Egypt and making the rig up test,
Eductation
Scientific Degree : Bachelor of Electrical Engineer- Ain Shames University
Faculty of Engineering, Cairo, Egypt, Nov.1990.
Graduation Project: Power Generation
Graduation Grade : Good, Very good.
Certification
Courses Completed:
Course Name Dated location
1 Power Generation May 1998 Cat T. C Alexandria. Egypt
2 Power Generation May 2000 Cat T. C Alexandria. Egypt
3 S.C.R Control System Feb 2001 Ross Hill T.C- Texas- USA
4 Quality Assurance & Safety May 2001 EDC T.C Cairo, Egypt
5 Safety & Occupation Daises Nov 2001 Assuott Univ. Cairo, Egypt
6 Mud Pump & Accumulator Jun 2002 EDC T.C Cairo, Egypt
7 Snr safety Aug 2003 EDC T.C Cairo, Egypt
8 Rig Instrumentation Jan 2004 EDC T.C Cairo, Egypt
9 H2S & Fir Fitting Mars 2005 EDC T.C Cairo, Egypt
10 MI SWACO instrumentation Aug 2005 NDC T.C UAE
Additional Information
Employment History
Senior Electrician.ENG N.D.C UAE from May2005 to date
Working in united Arabian emirate with national drilling co assigned rig ND09
Supper electrical rig working by GE S.C.R SYS As Maintenance & Troubleshooting of rig specific systems, Training national staff, Control & maintain equipments as IDM SCR control system, HVAC, Mud watch / DRILL watch and BLOCK CONTROLL SYSTEM & MI SWACO INSTRUMENTATION SYS
Senior Electrician, EDC/DPS- March 2004 to MAY 2005.
Working in Kingdom of Saudi Arabia, with Drilling Petroleum Services DPS, assigned in Rig DPS 44,
As Maintenance & Troubleshooting of rig specific systems, Training national staff, Control & maintain equipments as IDM SCR control system, HVAC, Mud watch / DRILL watch and BLOCK CONTROLL
Senior Rig Electrician, EDC, July 1994- July 2002
As a night electrician for 4 years, then promoted to Snr Electrician At Oct 1998. With duties include all aspects of Rig Maintaining & Troubleshooting, for all rig specific systems and equipments as Ross Hill, Hill Hayes SCR control system, Varco and National Oil well Top Drive System, Cat Power Generators and many others rig systems.
My Experiences tours As SNR Elect for 4 year were includes Rigs # 1 &18,49,9,41, 42,5,3and 4.
Hot Categories
Chemicals
Batteries