MECHANICAL ENGINEER HAVING 6 YEARS EXPERIENCE IN THE FIELD OF ENGINEERING AND TECHNOLOGY
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
A highly qualified Mechanical Engineer, seeking a challenging and professionally rewarding technical position in a similar or pure oriented, to contribute accrued expertise towards the qualitative enhancement of the organization.
Professional Experience
Project cum Safety Engineer in a sugar refinery at Jebel Ali Port Free Zone, Dubai, U.A.E. May 2007 ¡V Till date.
2) Mechanical Engineer in MARBCO TRADING & TECHNICAL SERVICES, Abu Dhabi, U.A.E. May 2004 ¡V April 2007.
3) Sales cum Service engineer in ALMOZROUEI ENGINEERIN TRADE Co LLC, Dubai, U.A.E, (August 2003 - December 2003).
4) Sales cum Service engineer in ION EXCHANGE INDIA Ltd Chennai, India, May 2002 - June 2003.
Eductation
„« B.E. Mechanical (1998 - 2002) in First Class from M.I.E.T. Engineering College, Bharathidasan University ,Tamilnadu, India.
„« M.B.A (2002 ¡V 2005) in Marketing Management from Alagappa University, karaikudi, Tamilnadu, India.
„« DIS - Diploma In Industrial Safety (2004 - 2005) in First Class from Annamalai University, Tamilnadu, India.
Certification
„« Intensive Course on Breathing Apparatus (SCBA).In Draeger Safety UK Ltd, Blyth, United Kingdom. (Nov 2005)
„« Intensive Course on Gas Detection Instruments. Conducted by Draeger Safety Germany in Sheraton Abu Dhabi. (Nov 2005)
„« Product training course of Hydraulic Rescue tools In LUKAS Hydraulics GmbH, Erlangen, Germany. (Feb 2005 )
„« Sales training course conducted by Drager Safety Germany in INTERSEC 2005 at WTC Dubai UAE.
Additional Information
„« Acted as reliability Engineer and provided technical support to maintain the existing Mechanical equipments and achieve compliance with international standards and regulations.
„« Inspect and evaluate the Materials for potential purchase, and evaluated costs of plant recovery, empowered to enter into contracts and purchase necessary equipment and supplies.
„« Designed and implemented recovery projects, including creating workflow schedules, scopes of work, and hiring workers, contractors, and technician members, including engineers.
„« Handling of natural gas pipeline project, design and execution of complete gas line, testing of gas lines, supervision and coordination on execution. Increased physical plant activities Technicians.
„« Increasing main drum reliability, increasing equipment consistency by developing and presenting a maintenance plan that included preventive, predictive, and corrective procedures and by using data collection equipment to implement a predictive maintenance and reliability analysis.
„« Designing and implementing our own operations and instructions manuals with plans, programs, product change, updates, specifications, information, schematic diagrams, installation & operations, repair, maintenance and strategies for personal and equipment improvement. (Breathing air cascade systems)
„« Manages an annual budget, including maintenance, new projects, and operation consumables.
Hot Categories
Chemicals
Batteries