Oil & Gas Job
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
To further my Technical skills and Supervisory experience. I would appreciate working with international standards and a responsible organization. I wish to apply for a position of Panel Operator and above.
Professional Experience
1)Jan.2001-Sep.2003 South Pars Gas Complex & TOTAL FINA ELF
Phases 2&3 Gas Plant, Assalouyeh, Iran
.Field Operator
.Senior Panel Operator
Phases 2&3 of South Pars Gas complex is the second part of South Pars Gas Field Development Project. This consortium included TOTAL FINA ELF as main contractor, and Hyundai Consortium as subcontractor.Onshore gas plant includes: two trains of slug catcher & HP separation unit; two condensate stabilization units by a total capacity of 80,000 bbl/day; MEG regeneration & injection unit includes four MEG regeneration packages & three HP injection pumps; four trains of gas sweetening , dehydration and Mercaptan removal 7 caustic regeneration units by a capacity of 500 MMSCFD for each train and finally utility services units.
2)Jul.2004-Recent South Pars Gas Complex & Eni Iran B.V.
Phases 4&5 , Assalouyeh , Iran
.Gas Plant Pre-commissioning/commissioning Supervisor
.Gas Plant Process Shift Supervisor
.Gas Plant Operation Shift Superintendent
Phases 4&5 of South Pars Gas Complex , is the third part of " South Pars Gas Field Development Project " which performed by Eni Iran BV. as main contractor, and Hyundai Consortium , as sub contractor , .
Onshore gas plant includes two trains of slug catcher & HP separation unit ; two condensate stabilization units by a total capacity of 80,000 bbl/day ; MEG regeneration & injection unit includes six MEG regeneration packages & three HP injection pumps ; four trains of gas sweetening , dehydration & ethane recovery units by a capacity of 500 MMSCFD for each train ; two ethane treatment & dehydration units by a total capacity of 1,000,000 ton/year ; two trains of NGL fractionation , treatment , dehydration & relevant caustic cycle units by a total capacity of 1,000,000 ton/year ; recompression unit includes six gas turbine compressors by a capacity of 400 ton/hr for each one ; four trains of sulfur recovery unit & one solidification package by a total capacity of 400 ton/day ; propane & butane cryogenic storages and finally relevant utility & off-site units .
Eductation
Sep.23rd.1996 ?V Nov. 22nd.2000
Ferdosi University Mashhad,Iran
B.S. in Chemical Engineering , Gas Processing .
B.S. Graduation Project : Researching in Ozone Generators Technology .
Certification
Dec.2003-May.2004 Eni Iran B.V. Tehran,Iran
.General English Language
.Technical English Language
.Basic & Specific Petroleum Technology Course
Additional Information
Professional Skills:
.Fully experienced in Safe Permit to Work System
.Fully experienced in Production Supervision
.Fully experienced i Gas Plant Precommissioing/Commissioning & start up
.Fully experienced in Distributed Control System (Yokogawa)
.Familiarized with HSE rules & Environment principles
.Familiarized with HIMA Automated Fire & Gas Detection and Protection System
.Familiarized with Emergency shut Down(ESD) system
.Fully Experienced with Microsoft Office Software
.Expert in OS Windows 98/2000/XP
.Expert in using Process simulation software including Hysys
I am an individual that self motivated. I enjoy challenges and problem solving with all disciplines. Currently I am working with a multi national work force and was able to communicate and exchange ideas that promoted reliability and enhancement of the plant production.