CV for Sr/Lead Electrical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
To utilize the 5M sources i.e. Man, Machine, Money, Material and Market available in the world to compete. To Set and Complete the targets during the Projects execution and Commissioning.
Professional Experience
Indian Petrochemicals Ltd. Nagothane Electrical Engineer 1987-1990 Installation, Testing & Commissioning/ Execution of the Gas Cracker, LDPE/HDPE, Polypropylene, Ethylene Oxide, Ethylene Glycol Projects- 220 kV power substations, 33 kV /6.9 kV substations, AC Drives, Emergency Diesel Generating Power Plant, MV/LV MCC’s & Switchgears, UPS System, HVAC, Protection and Relay
Ltd. Geetapuram, Dolvi
( Raigad)
Kalmeshwar
( Nagpur) Manager -Electrical 1995-1998 Engineering of the 220kV/33kV, 33kV/6.9kV Substations, Power Supply and distribution systems, Electrical System Study, Static Var Compensation (SVC), Ordering of the Equipments, preparation of the specifications, Technical Bid Evaluation. Installation testing and Commissioning of the Project including Substations for the Hot Strip Mill, DRI Plant etc.
Saudi Arabian Petrochemical Company- Petrokemya Inspection & Comng. Engineer- Electrical 1998-2001 Installation, Testing & Commissioning/ Execution of the Olefins-III Projects-AC Drives, Emergency Diesel Generating Power Plant, MV/LV MCC’s & Switchgears, UPS System, HVAC, Protection and Relay Co-Ordination, System Study, Fire Alarm/ Telephone / Public Address Systems, Furnaces for Ethylene, Screw Compressors etc.
Danieli & Co. SPA, Italy Inspection & comng. Specialist - Electrical 2001-August-2006 Installation, testing and commissioning of the AC/DC Drives, MV Motors, MV/LV MCC’s, Cyclo-converters, Variable Frequency Drives, Rectifiers, Hydrogen Plant for the Electrolytic Cleaning Plant, Electrolytic Tinning Plant, Cold Rolling Project, Hot Strip Mill Project.
Chiyoda Corporation, Japan
LNG Project Lead Electrical Engineer Sept.2006 onwards Engineering of the Electrical Power Substations for 66kV/33kV GIS, 33/6.9kV Substations, MV/LV MCC’s, Technical specification preparations for all the related equipments, Design of the Electrical distribution control system (ELICS), STG’s, GTG’s, EVFD’s and VSCF’s for the Power Generations, Operation philosophy of the entire projects, EDGS’s, Power system study- Harmonic Restraints, Transient Stability, Motor Reacceleration, Motor Inrush, SCC’s etc.
Eductation
Educational Qualification Exam. Passed Year of Passing Subjects
S S C
1979 Marathi, Hindi, English, Mathematics, Sciences, Social Science.
H SC
1981 English, Physics, Chemistry, Electrical Engineering, Mathematics-I & II.
Diploma in
Electrical Engineering
1985 Electrical Machines I & II, Utility of Electrical Energy, Industrial Organization & Management, Power Generation, Trans-mission and Distribution, TMEE & PWS.
B Sc Electrical Engineering USA 2001 Electrical Power, Utility of Electrical Energy, Electrical Machines- I & II, Design of Electrical Machines, Power Plant Engineering, HVDC and HVAC Engineering.
Additional Information
I had been worked in Indian Petrochemical Corporation Ltd. Nagothane which involves the installation, testing and commissioning of the 220kV/33kV and 33kv/6.9kV Power Substations, AC /DC Drives MV/LV MCC’s, Screw Compressors for Polypropylene plants, No load trails of the AC/DC motors for the Ethylene Oxide and Ethylene Glycol Plants, LDPE/HDPE Plants, 250MW Combined Gas Cycle Power
Hot Categories
Chemicals
Batteries