Egypt Zones accountACCOUNT

process engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 4 years
Relocation: Yes - Internationally

Industry Experience
4 years Process Engineer

Career Objective

process design ,simulation,

Professional Experience

Process and Safety Engineer
„X South Pars 17&18 project ?V ode consulting engineers (Cross Checking of process documents):
- PFD
- PID
- Data sheet
- Cause and Effect charts
- Line Lists
- Flare calculations (Flare KO drum sizing , Flare tip / Stack Sizing )
- Vessels sizing ( FWKO)
- Process Simulation (HYSYS)
- Process facility sizing
- Infield and export Pipelines hydraulic analysis (OLGA 2000 , Pipesim)
„X Bahregan Tank Farm project ?V (Developing of process documents):
- Pump Hydraulic Calculations
- Line Sizing
- Process Logic development
- Pump Datasheet

„X CNG stations project ?V Client : Iranian Fuel Conservation Company :
- Technical Bid Tabulation and Evaluation for process sections
2004-2006 National Iranian Oil Company Tehran-Iran
Process and Production Engineer
„X Assistant of following gas field well services:
- Shanul ?V Homa ?V Varavi ( Production Test , Shulumberger)
„X Supervision and cross checking of process documents and drawing of following projects:
- Sarkhun and Gavarzin Project Wellheads and Surface Facility
- Naft ?V Shahr Production Unit (Consultant : IPC )
- Naft ?V Shahr Production Unit- Water Treatment Unit (Consultant : OEID )
- Shanul-Homa Separation Area
- Khesht production, desalting, compressor station and water treatment units
- Sarajeh Underground storage facilities(Consultant : Sofregaz )
- Naft-Shahr Compression station (Consultant : Darya Pala )
- Nar Compressor Station (Consultant : Petro Farayand Energy )
- Cheshmeh Kosh Production Unit(Consultant : Namvaran )
„X Simulation of oil and gas facilities :
- Nar gas compressor station (HYSYS)
- Naft shahr production unit (HYSYS)
- Gas transportation for Shanul- Homa ?V Varavi gas transport to refinery(HYSYS,Pipesim,OLGA)
- Sarajeh Gas dew point adjustment
- Gashu flow lines network calculations
„X Cost Estimation and Economic Evaluation :
- Kuh ?V Kaki oil transport line
- Shanul- Homa ?V Varavi refinery economic evaluation
- Sarajeh Liquid transportation to Tehran Refinery
„X Technical Proposal Evaluation:
- Nar gas compressor station
- Sarkhun well heads corrosion packages
2003-2004 Energy Deployment Tehran-Iran
Sales and Site Engineer for cooling and boiler water treatment chemicals

Eductation

2002 - 2004 University of Tehran Tehran-Iran
M.Sc. in Chemical Engineering , GPA 17.5 / 20
1997 - 2001 Petroleum University of Technology Abadan-Iran
B.Sc. in Chemical Engineering , GPA 17.41 / 20

Certification


„X HYSYS process Simulator
„X OLGA 2000 dynamic multiphase flow simulator
„X Pipesim steady state multiphase flow simulator
„X HOSIM , FPT and GOAL simulator
„X Production Technology
„X Perforation technology

Additional Information

Private Activities:

„X Teaching
i. OLGA 2000 for Iranian Offshore Engineering and Construction company
ii. Pipesim for Iranian Offshore Engineering and Construction company
iii. Pipesim for Iranian Central Oil Field Company(Kermanshah office)
„X Process Documents developing for Khangiran 2 & 3 Phase Wellhead Separators:
i. Different Datasheets
ii. Sizing Calculations including : vessel sizing, PSV sizing, Control Valve Sizing
iii. P&ID development including : Separators , Pump
iv. Pump Calculation
v. Line Sizing Calculation
„X Karoon and Lali Oil Transportation
i. Pipeline comprehensive hydraulic Calculation including : Pipeline sizing , Pipeline performance calculations
„X Karoon Gas Separation and Transportation
i. Pipeline comprehensive hydraulic Calculation including : Wellhead and Transport Pipeline sizing , Pipeline performance calculations, Turn down calculation , Optimized route selection, Hold up calculation , finding optimum Location for Gas/Liquid Separation
ii. Sizing Calculations including : vessel sizing, PSV sizing, Control Valve Sizing , Slug catcher sizing
iii. P&ID development including : Separators , Pig launcher/Receiver , Incoming Manifold , Slug Catcher
iv. Line sizing Calculation
v. Control Philosophy
vi. Process Simulation (HYSYS)
vii. Pipeline Simulation (Pipesim)

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.