Cathodic Protection Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Project Lead Engineer.
Professional Experience
Comprehensive practical and commercial experience since 1997 in every aspect of cathodic protection systems on all types of structures, comprising detailed design preparation / engineering calculations and preparation of cathodic protection proposals for various projects. Reviewing, remarks, comments & recommendation on various design and materials as per specification of clients, Various site surveys, installation, installation training, supervision of installation, pre-commissioning, commissioning, report writing, CP monitoring, site investigative surveys, recommendations for up-gradation, trouble-shooting, manufacturing, assembling and testing of CP equipments. Work experience as CP site engineer, Project Engineer and Project Lead engineer on various projects.
Eductation
Qualifications:
Bachelor of Electrical Engineering from Aligarh Muslim University Aligarh, India. (B.E. 1993-94)
Diploma in Electrical Engineering from Aligarh Muslim University Aligarh, India. (1987)
Pre-university with Physics, Chemistry and Math’s from Aligarh Muslim University Aligarh, India. (1983)
High school with Physics, Chemistry and Math’s from S.T.high school, Aligarh Muslim University Aligarh, India. (1982)
Memberships:
N.A.C.E (Approved for level-3)
Summation: Since Diploma engineering working in the different fields in India and Saudi Arabia.
Certification
Please ask for detailed CV.
Additional Information
Ras Laffan Common Cooling Seawater system Phase II is a development undertaken by Qatar Petroleum (QP) for providing cooling water supply to rapidly growing mega industries at Ras Laffan industrial city of Qatar. I am only a CP engineer who is looking and control an entire project from Dodsal to site work including the client project management team. I am controlling from CP bid preparation to award the contracts, get CP design approval from client, kick-start the installation, train the site peoples, conduct the site inspections, reply the answers of client inspectors and convince, inspectors generally belong to electrical and civil. Attending and Resolve the various issues on design, materials, installation, time to time called by client.
Hot Categories
Chemicals
Batteries