Water Well Drilling and Development Specialist
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 20 years
Relocation: No
Career Objective
I would bring focus on quality of the drilling, well development and coring operations. Furthermore, I work well with others, and I am experienced in drilling design.
Professional Experience
Date (from – to) June 2006- present
Name of company Condrill AB
Type of business or sector Water well drilling and development
Occupation or position held Senior Drilling Engineer
Main activities and responsibilities • Ongoing optimization work over and development procedures according with field conditions.
Date (from – to) Dec 2004 – June 2006
Name of company SNC-Lavalin International Inc.
Type of business or sector Water well drilling and development - Great Man - Made River Project – Tazerbo and Sarir Work Over Job.
Occupation or position held Deputy Operational Manager , Safety Officer
Main activities and responsibilities • Ongoing optimization work over and development procedures according with field conditions.
Short description of equipment on drilling or workover rig / ship / others Reverse Circulation Rig, Cubex – top drive Rig, Ideco Rig, Failling Rig, Bucket Rig.
Date (from – to) June 2002 – Dec 2004
Name of company SNC-Lavalin International Inc.
Type of business or sector Water well drilling and development
Occupation or position held Deputy Operational Manager, Safety Officer.
Main activities and responsibilities Deputy Operational Manager
• Ongoing optimization of drilling and development procedures according with field conditions.
Short description of equipment on drilling or workover rig / ship / others Reverse Circulation Rig, Cubex – top drive Rig, Ideco Rig, Failling Rig, Bucket Rig.
Date (from – to) June 2002 – Dec 2004
Name of company Foradex SA
Type of business or sector Water well drilling and development
Occupation or position held Site Manager
Main activities and responsibilities • Drilling & development coordinator of all site activities.
Date (from – to) March 1997 – June 1999
Name of company SNC-Lavalin International Inc.
Type of business or sector Drilling of 129 potable water wells in the Sahara desert was one of the most ambitious construction projects of the 20th century, called the Great Man-Made River. It aims to make Libya self-sufficient in agriculture. The work, deep into the desert (Tazerbo site), included drilling of 108 production wells with a depth of 700 to 1,000 m and 36 piezometers wells at depths varying from 100 to 1,200 m (250 mill. US$ - project), and installing of more than 45 km of stainless steel casing and screens (24” and 10 ¾”).
Eductation
Date (from – to) 1981 -1986
Name of organizations M Sc. Petroleum Engineering, University
Certification
Certificate Number Seria D Nr. 14192 C.G. Nr. 514/1981 – Cod. 17.6.10.g/1985
Validation of Certificate Thesis: Stress Analysis and Design of Drilling Assembly Nr. 2095/15.11.1986
Additional Information
MOTHER TONGUE Romanian
OTHER LANGUAGES English French
Reading skills Very good Very good
Writing skills Very good Good
Verbal skills Very good Good
Hot Categories
Chemicals
Batteries