erection of generator and bus duct (11kv),erection of transformer 165MVA and accessories. all panel erection and testing.
Professional Experience
July 2005 TO TILL DATE:
Joined ESSAR CONSTRUCTION Ltd. (POWER PLANT DIV.) As an Electrical Engineer (Power Plant).
The project is for 500MW combined cycle gas based power plant with 220KV switchyard with power export to grid facility. The combined cycle commissioned in record ten - month time.
The major system in the project is following:
„« Frame 9E Gas Turbine
„« Siemens AG Steam Turbine
„« 105 MW, 15KV Generator. Air-cooled.
„« 55 MW, 11KV Generator. Water - cooled.
„« 110 MW, 15KV Generator. Air-cooled
„« 04 No. Generator Transformer of 160MVA & 165MVA of 15/220KV & 75 MVA of 11/220KV with On-load Tap Changer with forced oil and forced air cooled (OFAF)
„« 02 No. Station Transformer of 16 MVA each having cooling system ONAF
„« 09 Bay 220KV switch yard with 2Km. Tie line double circuit with Moose Conductor
Sep-2001- June-2005
Joined M/S RANGANATHAR INDUSTRIES (P) LTD. in Sep 2001 as an Trainee Engineer and became Maintenance Engineer (Electrical) to led a team of Technicians.
JOB PROFILE:
A) ERECTION, TESTING COMMISSIONING AND MAINTENANCE:
I had experience of erection, testing commissioning and maintenance of following electrical equipment/systems.
„« Planning of requirement of raw materials for process and maintenance needs.
„« Power Transformer 160 MVA, 165MVA & 75 MVA, Station Transformer 16 MVA & 2 MVA Service Transformers 2 MVA, erection, testing & commissioning.
„« 15KV & 11KV Bus duct Erection & Testing.
„« Battery Bank & Battery Charger Panel (with UPS) Erection, Testing & Commissioning
„« 220 KV Switchyard Equipment Erections, Testing & Commissioning.
„« HT & LT Switchgear Erection, Testing & Commissioning.
„« HT, LT & Control Cable Routing, Jointing & Termination.
„« HT, LT & Control Cable Tray Routing.
„« Structural Earthing & Grounding of whole plant.
„« Lighting system & Lightning system of whole plant.
„« Routine Maintenance jobs of various lines.
„« Project planning & Progress Monitoring.
„« Material Handling