MBA/Mechanical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
To start career with an organization that offers professionalism, continuous learning environment and scope of career development.
Professional Experience
1) Organization: Integrated Consultants Ltd. Dhaka.
Position Held: HVAC Engineer
Duration of Service: 02.04.2000 to 31.07.2000 @ 04 months
2) Organization: Gulf Environmental Technologies Ltd.
Position Held: Deputy Manager (HVAC)
Duration of Service: 01.08.2000 to 31.10.2000 = 03 months
JOB DESCRIPTION (1+2):
Design & Site supervision of central air conditioning systems.
3) Organization: Lahmeyer International Pally Power Services Ltd. (LIPPS)
Job Location: 140MW Gas Turbine Power Plant, Bangladesh.
Position Held: Juniour Shift Engineer
Duration of Service: 01.11.2000 to 31.10.2001 = 1 year
JOB DESCRIPTION:
a) Operation & control of gas turbines having capacity of 35 MW by MK-V and Distributed Control Systems (DCS).
b) Monitor and evaluation all types of data, curves, graphs, historical tread lines, diagnostics alarms etc in DCS and MK-V computer & alarm printer.
c) Checking all equipments related to turbine and maintenance of turbine auxiliaries, balance of plant’s equipments & sub-station parts.
4) Organization: LIPPS
Job Location: 140MW Gas Turbine Power Plant, Bangladesh.
Position Held: Maintenance Engineer - (Mechanical Maintenance & Spares Control)
Duration of Service: 01.11.2001 to 03.08.2005 = 03 years 09 months
JOB DESCRIPTION:
a) Day-to-day repair works.
b) Routine/scheduled maintenance works.
c) Special maintenance works esp. practically involved in the 12 Combustion Inspections (CI) for combustion chamber overhauling and 4 Hot Gas Path Inspections (HGPI) both for combustion and turbine overhauling.
d) Planning for requirements of turbine capital parts, spare parts, consumables, tools and equipments for smooth operation and maintenance of the gas turbines.
e) Planning of capital parts & consumables for CI/HGPI/Major overhauling.
f) Communication & follow up of parts.
g) Planning & control of refurbishment procedure (Invoice & packing list, box up and transportation etc.) of capital parts from Thomassen Turbine Systems, The Netherlands and Abu Dhabi.
h) Tracing of recycled capital parts.
i) Yearly Inventory Control.
[5) Organization: LIPPS
Position Hold: Deputy Manager (Technical)
Duration of Service: 04.08.2005 to till to date = 2 years
JOB DESCRIPTION:
a) Assist Top Level Managers.
b) Communication & follow up.
c) Supervise and control the subordinates
d) Reporting.
Eductation
Degree Studying: Master’s of Business Administration (MBA)
Institution: Southeast University, Dhaka, Bangladesh
Credit Hours: 60 (Regular)
Semesters Completed: 4th Semester out of 5
Degree Attained: Bachelor of Science in Mechanical Engineering
Institution: Bangladesh University of Engineering & Technology (BUET)
Department: Mechanical
Result Obtained: First Class
Year of Passing: 2000
Education Attained: Higher Secondary Certificate Examination (H.S.C.)
Institution: Ananda Mohan College
Board: Dhaka
Result Obtained: First Division
Year of Passing: 1992
Education Attained: Secondary School Certificate Examination (S.S.C.)
Institution: Nasirabad Collegiate School
Board: Dhaka
Result Obtained: First Division
Year of Passing: 1990
Certification
FOREIGN TRAINING:
Organization: Thomassen Turbine Systems, Rheden, The Netherlands
A foreign training program had been completed on major components, parts recognition, repairing procedures and parts logistics of General Electric Heavy Duty Gas Turbines that was conducted by Thomassen Turbine Systems (TTS), Rheden, The Netherlands
LOCAL TRAINING:
1) Organization: Bangladesh Blade Factory, Tongi, Gazipur, Bangladesh.
28 days industrial training program had been completed on production procedure of blade and
maintenance of machineries.
2) Organization: 140MW Gas Turbine Power Plant, Shambuganj, Mymensingh, Bangladesh.
Successfully completed 30 days job site training on turbine operation & control, maintenance of turbine accessories, balance of plant & sub-station equipments etc.
Additional Information
THESIS:
Thesis completed on Air Conditioning load calculation for insulated and non-insulated brick house under the supervision of Dr. Maglub Al Nur, Professor, Department of Mechanical Engineering, Bangladesh University of Engineering & Technology (BUET), Dhaka, Bangladesh.
COMPUTER SKILL:
Control Systems: MK-V & DCS Control Systems, Knowledge on PLC and SCADA.
Design Software: AutoCAD 2000
Other Applications: MS Word, MS Excel, MS Power Point, Photoshop, Internet.
LINGUAL SKILL:
a) Proficient in oral and written communication both Bengali & English.
b) An English language course had been completed that was conducted by British Council.
HOBBIES/SPORTS AREANA:
Hobbies: Traveling, Watching News and Reading Newspaper
Sports: Interested to play and enjoy Football, Cricket, Chess, Badminton, Table Tennis etc.
REFEREE:
1)Mr.Abu Zafar Reza-ul Haque
37 Simei Road # 4
# 10-09 Modena, Singapore
Phone (M): +65 82336747.
2)Mr. Yu – Jin Tay
Shearman & Sterling LLP
6 Bettery Road # 25-03, Singapore 049909
Phone: +65 62303839
Phone (M): +65 97202920
Fax: +65 62308995
Mohammad Mustafizur Rahman
Date:
Hot Categories
Chemicals
Batteries