engineer (civil/structural/proposal)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Managerial position at multinational organization with had to manage large scale of project. To be
advanced in the industry involve.
Professional Experience
„X Coordinate tender estimation for structural discipline.
„X Study and review tender documents i.e. scope of work, contract conditions, specifications and tender drawings and all other documents related to tender.
„X Prepared materials take off for material estimation cost purpose (specialized in offshore structure).
„X Prepared estimation cost for tender bid projects (including materials, equipments, labours, managements, consumables, & etc.)
„X Estimation of direct and indirect costs.
„X Preparation of Technical and commercial proposals.
„X Prepared responses for bid clarifications from client and identify areas of commercial implications.
„X Prepared method of statement.
„X Assigned as a Load out Engineer .
„X Prepared Engineering Corporate Procedures.
„X Checked Technical Bid Evaluation from vendors for material purchase purpose.
„X Prepared Site Technical Query (STQ) for every substitution/deviation.
„X Involved in vendor clarification.
„X Prepared, checked and counter checked Material Take Off (MTO).
„X Checked shop drawing, purchased requisition, and cutting plan.
„X Prepared Weekly Progress Report.
„X Involved Meeting and Progress meeting .
„X Prepared Foundation Study.
1. Design temporary support for fabrication..
2. Analysed integrity of the whole jacket during fabrication and load out by using Staad Pro software.
3. Design fabrication and load out support.
4. Foundation support design/check.
5. Advised structure location for fabrication.
6. Prepared load out method study.
7. Prepared erection sequence for fabrication the jackets.
8. Prepared load cost study.
„X Prepared Lifting Procedures. The procedures are:
1. Typical lifting procedure for jacket leg assembly,pile assembly, conductor piles assembly,elevation panel assembly,X-braces assembly,top panel assembly,open drain water sump caisson,riser pipe assembly (installation),trial fit boat landing.
„X Attended Monthly Load-Out Coordination Meeting with Offshore Installation Contractor.
„X Prepared Load out and Sea fastening Procedure.
1. Load out and sea fastening procedure for jacket.
2. Load out and sea fastening procedure for piles, conductors, and appurtenances.
Eductation
1999 ¡V 2003 B.Eng. Civil (Honors)
Universiti Teknologi Malaysia, Skudai,Johor, Malaysia (Technology University of Malaysia) 2nd Class Upper
1997 ¡V 1998 Sijil Pelajaran Malaysia (Malaysia Education Certificate)
Sekolah Menengah Teknik, Kota Tinggi, Johor. (Technical School) 12 Aggr.
Hot Categories
Chemicals
Batteries