Instrumentation QA/QA Inspector/Supervisor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
Looking for a job in the field of instrumentation where i can use my experience to achieve company targets
Professional Experience
1)Company PETRO- RABIGH A Joint Venture Company By Sumitomo
Chemical co.Ltd.(Japan) & Saudi Arabian Oil Co.(Saudi Aramco)
Location Saudi Arabia
Position INSTRUMENTATION QA/QC INSPECTOR
Inclusive Date March 28, 2007 To Up to date.
2)Company Jubail United Petrochemical Co.(JUPC)
by Sabic and Flour Danial
Location Saudi Arabia
Position INSTRUMENT QA/QC INSPECTOR
Inclusive Date April 21, 2004 To December 05, 2006
3)COMPANY Millac Foods Private Limited Pakistan
POSITION INSTRUMENT SUPERVIOSR
INCLUSIVE DATE NOV 30,2002 ~ Apri10, 2004
4) COMPANY Jubail Petrochemical company Kemya
(Joint Venture of Sabic & Exxon)
LOCATION Saudi Arabia
POSITION INSTRUMENT QA/QC INSPECTOR
INCLUSIVE DATE August 18, 2000 To August 25, 2002
5) Company : PAK-AMERICAN FERTILIZERS LTD. (TOYO ENGG. PROJECT)
Position : Instrument Technician & QA/QC INSPECTOR
Inclusive Date : OCT 02, 1997 ~ AUGUST 15, 2000
•Review plans and drawings in accordance with specifications, codes and standards. Conduct activities and inspection in accordance to Project Quality Assurance Manual and Quality Control Inspection Plan. Monitor daily discipline activities and verifies compliance to project procedures, specifications and standards. Identify quality problems, reject non-conforming items and initiate, recommend or provide solutions to the problems with customer sanction / approvals through designated channels. Conduct random surveillance on operator's qualifications, tools and equipment, working practices as well as storage and preservations.
•As Per Sabic Standards, Specifications, Instrument Calibration Method of Statement & As Per Approved Project Drawings Supervised, Inspected & Witnessed Instrument Cable Duct Bank, Cable Pulling from RIB to J.B & Control Room and RGS conduit, Stanchion of instrument devices, Marshalling Panel, Junction Boxes installation, Mounting of instrument devices such as pressure, level, temperature transmitter, RTD and thermocouple, pressure, Level, Flow and temperature switch & Control valves .
•Involved in FAT(Factory acceptance test) & SAT(Site acceptance test) Activities
Eductation
1- Apprenticeship in Industrial Instrumentation & Process Control
In 1997 From NFC Institute IET Multan.
2-F.SC (Pre-Engineering) Session 1993-1995
Hot Categories
Chemicals
Batteries