resume for mechanical engineer (static ,rotary and packaging equipment)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
TO work with an organization, that allows me to grow and utilize my professional skill and experience of a very intense and diverse construction background to ever larger and or more complex project.
Professional Experience
• 2006 to present
working as Site Engineer (static & rotary Equipment)
Rabigh Olefin plant project (ROPP)
Consolidated Contractor Company (CCC)
SAUDI ARABIA.
Client JGC ARABIA LTD.
Duty & responsibilities: Installation and Alignment of static& Rotary Equipment. Heavy equipment like tower, vessel, drum, heat exchanger, surface condenser, Dox unit, PSA unit, centrifugal pumps , reciprocating pumps &can pumps, compressor, turbine, transformer, Installation of Vessel Internals.( Types of tray UOP, SULZER, S&W ripple tray, FCP tray ).
• 2005 to2006
working as Equipment Engineer (static and rotating )
Dolphin onshore gas processing and facilities project
M/s Nasser Al Hajari. co. Ltd
Doha –QATAR
Client JGC Middle East FZE.
Duty & responsibilities: pre assembly, Alignment and Installation static &rotating equipment. Air fin Cooler (induced and forced Type), Installation of trays in towers and drums, valve tray, BDH tray, alignment and installation of centrifugal pumps, Preservation of static and rotary
Equipments.
• 2004 to 2005
working as Equipment Engineer
ORYX GTL PROJECT RAS LAFFAN
M/s Nasser Al Hajari co.Ltd
Doha –QATAR
Client Technip Middle East Project 2158
Duty & responsibilities: Installation &pre Assembly of Fired steam Super Heater, Fired Process Heater, Steam reformer, Fractionators feed heater, heat Exchanger, convection module, radiant coil, fluegasduct, and stack. Air Fin Cooler, Execution of piping (ASME), refractory &insulation work.
• 2002 to2004
working as Equipment Engineer
Hajee A.P.Bava & Co Engineering contractors,
Chaliyam, Calicut, kerala.
Duty & responsibilities: Installation, Alignment, Pre commissioning, commissioning of static &rotating equipment. rotary Kiln cell, ESP,ABC, conveyor for preheater, centrifugal and reciprocating pumps & motors, conveyor structure columns, girders, duct ,chute, reject bin Raw mill cyclone, raw mill ducts, EOT cranes for Sponge iron plant &Cement Plant .
• 1996 to 2001
Site Engineer
B & C Construction, Engineers &Contractors
Manikkath, Ravipuram road, Cochin-16
Duty & responsibilities: Erection &Alignment power pressing machine, rolling mill, fabrication bucket conveyor structure, belt conveyor, coal mill ducting, and grade cooler, centrifugal and reciprocating pumps compressors
Eductation
EDUCATION
Bachelor of Engineering, Mechanical Engineering
Gulbarga University Gulbarga
Bachelor of Science (P.C.M)
Gulbarga University
Skills and Abilities
Computer Basic& operating System
Paint & coating Inspection.
Certification course from NACE International Corrosion Society, India
Additional Information
Over 10 year of Experience in Mechanical Engineering and Construction Supervision, alignment , installation ,pre commissioning, and commissioning of static and rotary equipment in Oil gas, sponge iron plant and cement plant.
Hot Categories
Chemicals
Batteries